Skip to content

Phoenix

Phoenix adopts the Phoenix Building Construction Code (PBCC). The 2024 PBCC, approved by the City Council on June 18, 2025 (Ordinance G-7397) and effective August 1, 2025, is built on the 2024 I-codes (IBC, IRC, IEBC, IECC, IMC, IFGC, IPC, ISPSC, optional IgCC) and the 2024 UPC, with the 2023 NEC and ASME elevator standards; the 2024 IFC with Phoenix amendments is the fire code. The Planning and Development Department issues permits and inspects.

15 codes are in force here, 15 of them checked at the source, and this page was last updated November 19, 2026.

Codes in force

Building2024 Phoenix Building Construction Code: 2024 IBC (with Appendix E) and Chapter 1 administrative provisions, Phoenix amendments (Ordinance G-7397)

Applies toAll buildings in Phoenix other than those under the residential code.

Based on, and how far it reachesIBC, 2024 edition.The city adopts it itself.

Local changesPhoenix amendment documents for the IBC and its Chapter 1. The city reports that plans submitted after December 31, 2025 must meet the 2024 code and that standard plans approved under the 2018 code stay valid until July 31, 2026. The code allows mass timber buildings up to 18 stories (ICC report).

Adopted byCity of Phoenix, Planning and Development Department.In force since August 1, 2025.

Houses2024 IRC with Phoenix amendments (appendices BA, BB, BF, BG, BI, BJ, BO, CA, CB, CD, CE, CF, NB and NE adopted)

Applies toOne- and two-family dwellings and townhouses in Phoenix.

Based on, and how far it reachesIRC, 2024 edition.The city adopts it itself.

Local changesPhoenix amendment document for the IRC; details not confirmed.

Adopted byCity of Phoenix, Planning and Development Department.In force since August 1, 2025.

Checked at the source
Existing buildings2024 IEBC with Phoenix amendments

Applies toRepairs, alterations, additions and changes of occupancy of existing buildings.

Based on, and how far it reachesIEBC, 2024 edition.The city adopts it itself.

Adopted byCity of Phoenix, Planning and Development Department.In force since August 1, 2025.

Checked at the source
Energy, houses2024 IECC with Phoenix amendments, residential provisions

Applies toEnergy efficiency of new houses in Phoenix.

Based on, and how far it reachesIECC, 2024 edition.The city adopts it itself.

Local changesPhoenix amendment document covers IECC Chapter 1 administration; other changes not confirmed.

Adopted byCity of Phoenix, Planning and Development Department.In force since August 1, 2025.

Checked at the source
Energy, other buildings2024 IECC with Phoenix amendments, commercial provisions

Applies toEnergy efficiency of commercial and multifamily buildings in Phoenix.

Based on, and how far it reachesIECC, 2024 edition.The city adopts it itself.

Adopted byCity of Phoenix, Planning and Development Department.In force since August 1, 2025.

Checked at the source
Fire2024 International Fire Code with Phoenix amendments (Phoenix Fire Code)

Applies toFire prevention and protection in Phoenix.

Based on, and how far it reachesIFC, 2024 edition.The city adopts it itself.

Local changesPublished as the 2024 Phoenix Fire Code packet; the city's building code page does not give its effective date.

Adopted byCity of Phoenix, Phoenix Fire Department.

Plumbing2024 UPC (appendices A, B, C, I and M) and 2024 IPC (appendices C and E), each with Phoenix amendments

Applies toPlumbing in Phoenix; both the UPC and the IPC are part of the PBCC. UPC Appendix M (water demand calculator) is adopted.

Based on, and how far it reachesUPC or IPC, 2024 edition.The city adopts it itself.

Adopted byCity of Phoenix, Planning and Development Department.In force since August 1, 2025.

Checked at the source
Mechanical2024 IMC with Phoenix amendments

Applies toMechanical systems in Phoenix.

Based on, and how far it reachesIMC, 2024 edition.The city adopts it itself.

Adopted byCity of Phoenix, Planning and Development Department.In force since August 1, 2025.

Checked at the source
Fuel gas2024 IFGC with Phoenix amendments

Applies toFuel gas piping and appliances in Phoenix.

Based on, and how far it reachesIFGC, 2024 edition.The city adopts it itself.

Adopted byCity of Phoenix, Planning and Development Department.In force since August 1, 2025.

Checked at the source
Electrical2023 National Electrical Code with Phoenix amendments

Applies toElectrical work in Phoenix.

Based on, and how far it reachesNFPA 70, 2023 edition.The city adopts it itself.

Local changesFull enforcement of 2023 NEC 210.8(F) Exception 2 (GFCI for HVAC equipment) is deferred to March 1, 2027.

Adopted byCity of Phoenix, Planning and Development Department.In force since August 1, 2025.

AccessibilityICC A117.1-2017 as scoped in the amended 2024 IBC, and the 2010 ADA Standards for Accessible Design

Applies toAccessibility of buildings in Phoenix.

Based on, and how far it reachesICC A117.1, 2017 edition.The city adopts it itself.

Adopted byCity of Phoenix, Planning and Development Department.In force since August 1, 2025.

Checked at the source
Elevators and escalatorsASME A17.1-2022 with Phoenix amendments; A17.3-2023 (existing), A17.6-2022 and A18.1-2023 (not amended)

Applies toElevators, escalators, platform lifts and stairway chairlifts in Phoenix.

Based on, and how far it reachesASME A17.1, 2022 edition.The city adopts it itself.

Adopted byCity of Phoenix, Planning and Development Department.In force since August 1, 2025.

Checked at the source
Pools and spas2024 ISPSC with Phoenix amendments

Applies toPools and spas in Phoenix; the state pool enclosure law (A.R.S. 36-1681) also applies.

Based on, and how far it reachesISPSC, 2024 edition.The city adopts it itself.

Adopted byCity of Phoenix, Planning and Development Department.In force since August 1, 2025.

Green building and stretch codes2024 International Green Construction Code (optional)

Applies toOptional green code a project may choose; not required.

Based on, and how far it reachesIgCC, 2024 edition.The city adopts it itself.

Adopted byCity of Phoenix, Planning and Development Department.In force since August 1, 2025.

Checked at the source
Sprinkler rules for housesHouse sprinklers under state law (A.R.S. 9-807)

Applies toState law bars Phoenix from requiring fire sprinklers in single-family detached homes or buildings of no more than two dwelling units, unless a requirement was adopted before December 31, 2009. Phoenix's treatment of IRC R309 was not confirmed.

Based on, and how far it reachesIRC, 2024 edition.A state limit that the city may not go beyond.

Adopted byArizona Legislature.

Checked at the source

Not adopted here, or not found yet

Property maintenanceProperty maintenanceNot found

Applies toPhoenix's property maintenance ordinance is not confirmed.

Based on, and how far it reachesThe city's own law.

Adopted byCity of Phoenix.

Not yet checked at the source

Who designs, seals and builds

Architect
State law applies: a non-registrant may design a detached single-family dwelling, and one- or two-story buildings up to 3,000 square feet occupied by no more than 20 people with spans of 20 feet or less (unless engineer-approved trusses or lintels); larger work needs a registered architect or engineer.A.R.S. 32-144Checked at the source
Engineer
State law applies: the Board of Technical Registration's exemptions in A.R.S. 32-144 cover engineering too; work outside them needs a registrant.A.R.S. 32-144Checked at the source
Contractor
Contractors are licensed statewide by the Registrar of Contractors; casual or minor work under $1,000 that needs no permit is exempt.A.R.S. 32-1121Checked at the source

Design loads and hazards

Wind
From the 2024 IBC and IRC (ASCE 7-22) maps; Phoenix's Table R301.2 values were not confirmed.
Snow
No meaningful ground snow load in the low desert; value not confirmed from the city's table.
Seismic
Low; not confirmed from the city's table.
Frost depth
Near zero; not confirmed from the city's table.
Flood
Monsoon flash flooding; Maricopa County Flood Control District and city floodplain rules (not confirmed).
Other hazards
Extreme heat; expansive and collapsible desert soils.
Not yet checked at the source

Permits

Who issues them
City of Phoenix Planning and Development Department issues building permits, reviews plans and inspects; the Phoenix Fire Department handles fire code permits.
Review time limits
State law: the city must publish overall time frames for each permit, split into administrative completeness and substantive review, and refund review fees if it misses them (A.R.S. 9-835). It may not change an approved residential plan or permit during construction.
Private review
No city or state private plan review program was confirmed.

Where to read the codes, and who to ask

Not found yet

  • The effective date of the 2024 Phoenix Fire Code is not confirmed; the city's building code page does not give it.
  • Transition details (December 31, 2025 deadline, 2018 standard plans valid until July 31, 2026) come from reports of the city's implementation notice, which was not confirmed in full.
  • Phoenix amendment content (IRC R309 sprinklers, Table R301.2 values, floodplain rules) was not confirmed.
  • Phoenix property maintenance ordinance and any self-certification or private review program are not confirmed.