Skip to content

Sealing a house becomes a review instead of a redraw.

Every set reaches you with its schedules computed, and we pay you per seal.

Review queueThe Mangrove, Lot 7
STRUCTURAL DESIGN CRITERIAITEMCodeRisk categoryUltimate wind speed VultAllowable wind speed VasdWind speed fromExposureEnclosureWind-borne debris regionMean roof heightZone 5 (corner) widthRoof live loadRoof dead loadAttic live loadFloor live loadSoil bearingVALUEFBC Residential, 8th Ed. (2023), ASCE 7-22II140 mph108 mph (FBC-R R301.2.1.3)Hillsborough County default, not confirmed for this lotBEnclosed, GCpi +/-0.18Yes, impact protection16 ft4.9 ft20 psf (FBC-R R301.6)15 psf top chord, 10 psf bottom chord (assumed)10 psf, 20 psf where storage (Table R301.5)40 psf, slab on grade2,000 psf assumed, verify by test
Schedules
6 tables
Lintels
5 marks
Roof framing
81 trusses
  1. Wind and structural design criteria
  2. Wall components and cladding pressures (ASD
  3. Lintel and beam schedule
  4. Connector schedule
  5. Truss layout
  6. Truss uplift table

Today, your seal puts your name behind the whole set, whoever worked it out.

  1. A drafter draws the set you will seal

    14 to more than 150 hours1

  2. You check every value from scratch

    sheet by sheet

  3. A revision comes back

    and you read the whole set again

  4. The truss layout arrives last

    and has to match the wind loads you sealed

A drafter, on one set1

XYZ, at the same scale

Drawn to one scale, a drafter's hours on a set fill the bar, and the engine's whole run is thinner than a hairline at its left end.

With XYZ, every schedule you sign is computed from the same model as the drawings, so your time goes to checking the work rather than rebuilding it.

  1. The set and its schedules are computed from one model

    36 milliseconds at the median2

  2. It arrives in your review queue

    with the date it is due

  3. You review it or send it back

    with notes sheet by sheet

  4. You seal it, and we pay you for the seal

    at the fee agreed in writing

Three jobs change most for engineers, and the plan beside them shows each one with XYZ.

S-001 Lintel and beam schedule5 lintel marks
DWREFDWHAHUATTIC ACCESSGARAGE21'-9 3/4" x 21'-0"BATH 28'-5 3/4" x 7'-5 3/4"LAUNDRY7'-7 1/2" x 7'-5 3/4"PANTRYHALL21'-9 3/4" x 3'-3 1/2"CLBEDROOM 310'-5 3/4" x 11'-9 3/4"BEDROOM 210'-11 1/2" x 11'-9 3/4"CLDINING12'-0" x 15'-4"ENTRY PORCH7'-4" x 5'-8"FOYER7'-4" x 9'-8"KITCHEN20'-3 1/2" x 13'-9 3/4"GREAT ROOM20'-3 1/2" x 17'-9 3/4"BEDROOM 415'-8" x 9'-9 3/4"CLBATH 315'-9 3/4" x 5'-7 1/2"OWNER'S WIC5'-7 1/2" x 10'-7 1/2"OWNER'S BATH9'-9 3/4" x 10'-7 1/2"OWNER'S SUITE15'-9 3/4" x 17'-9 3/4"COVERED LANAI18'-8" x 13'-4"L1L1L2L3L3L3L3L3L3L3L4L4L4L5L5
MarkLengthQty
L13'-4"2
L24'-0"1
L34'-8"7
L47'-4"3

01

The structural review

Today

The wind criteria have to be confirmed for the lot before any of the structure can be checked.

With XYZ

The wind criteria and the lintel, beam and connector schedules are worked out from the model that drew the set and laid out for you to check.

02

The revision

Today

A small change to a window or a wall can move a load you have already checked.

With XYZ

The version diff lists only what changed since your last round: rooms, openings, schedules, the code checks whose status changed and the order lines.

03

The truss maker

Today

A truss layout that misreads the uplift sends you back into the calculations.

With XYZ

A truss uplift table from the same model gives the net uplift at each bearing and the connector for it, printed for the truss maker.

Here is what comes with every set in your queue.

    • One-story house, 4 bedrooms, 2,373 sq ftDue in 2 business days
    • One-story house, 3 bedrooms, 1,985 sq ftDue in 3 business days
    • Two-story house, 4 bedrooms, 3,029 sq ftDue in 4 business days
    • Row of 3 townhomes, 1,821 sq ft eachDue in 5 business days

    A review queue with the date each set is due

  • ItemValue
    Ultimate wind speed Vult140 mph
    Allowable wind speed Vasd108 mph
    Wind speed fromHillsborough County default, not confirmed for this lot
    ExposureB
    EnclosureEnclosed, GCpi +/-0.18

    Wind and structural design criteria, with lintel, beam and connector schedules

  • T1 540 lb at each bearing

    A truss layout and a truss uplift table for the truss maker

    • Dining184.0 sq ft 194.2 sq ft
    • Entry Porch41.6 sq ft 45.3 sq ft
    • Foyer70.9 sq ft 77.3 sq ft
    • Kitchen280.3 sq ft 298.7 sq ft
    • Great Room361.4 sq ft 385.2 sq ft
    • Bedroom 4160.8 sq ft 173.9 sq ft
    • Closet23.1 sq ft 25.7 sq ft

    A version diff between rounds

    1. Round 13 checks for you

      2,373 sq ft, 19 sheets

    2. Round 26 groups changed

      2,499 sq ft, 19 sheets

    Notes sheet by sheet, and a record of every round

  • InputValue
    Conditioned floor area2,373.3 sq ft
    Conditioned volume22,151 cu ft
    Slab on grade under conditioned rooms2,373.3 sq ft
    Slab edge of conditioned rooms184.7 lin ft
    Ceiling under the attic2,373.3 sq ft

    Energy inputs for your energy partner: areas by orientation, R-values, U-factors and equipment

The sample house set

Take our sample house set with you

The Palmetto is the sample house we hand over as a whole set, drawn, checked and priced by the same engine that draws yours.

What it pays

We pay you per seal

  • Reviewing a set in your queue$0
  • Reading a revision's changes$0
Each set you sealYour fee

Nothing is charged to you for reviewing a set, whether it is a sample or one you go on to seal.

  • Review queue and tables
  • Version diff
  • Your fee per seal, agreed in writing

Questions engineers ask

Who is responsible for the design?

You are, as engineer of record. XYZ gives you the model, the drawings and the schedules, and you review them, change what you need and seal only what is under your responsible charge.

How am I paid?

Per sealed set, at a fee agreed in writing before you seal the first one. You record it with each set in your queue, so every round is accounted for.

What can XYZ draw today?

XYZ draws one-story houses of 1,900 to 2,600 sq ft, two-story houses of 2,600 to 3,600 sq ft and rows of 3 to 6 townhomes, with hip roofs and 3 or 4 bedrooms. We draw to the Florida Building Code today, for lots in Hillsborough, Pinellas, Pasco, Polk, Manatee and Sarasota counties, at planning prices for that area. We lay out the rooms ourselves; room sizes and places in a sketch are noted for review. If your brief asks for something outside that, we tell you before we draw, so nothing about your house changes without you knowing.

Which building code do you check against?

The drawing engine checks the Florida Building Code today, in the edition in force on the day you file (the 8th, then the 9th, expected from December 31, 2026), and our code library lists the codes in force in every other state so you can see what applies where you build.

Open the review queue with a house drawn from one of our sample briefs, and you will see exactly what you would be signing.

Doing something else in real estate? See how XYZ helps the other roles

Sources, 2

  1. 1Fixr, Draftsman cost, January 31, 2025. How long a drafter works on a set of house plans: about 14 to more than 150 labor hours, from about 2 days to several weeks, longer when the plans change along the way.
  2. 2XYZ Blueprint benchmark, 3,168 houses, November 21, 2026. Each of 3,168 houses (1,152 one-story, 1,152 two-story and 864 townhome buildings, under both code editions) was timed once on a laptop (AMD Ryzen 7 5700U with Radeon Graphics (16 threads), 15 GB memory, Windows 11 Home, Node v24.11.1), from the confirmed program to the full drawing set, code review and materials order; reading your brief and your browser drawing the sheets are not in this time. Savings compare each order line with the allowance a builder would usually add for that material, as our takeoff assumes it (a builder's own will differ), and count a line where the exact layout needs more as a loss. Prices are the takeoff's planning prices for Tampa Bay, not quotes. The test count is the number of written tests in our checks, all run before every push.