Send us your next house, and we will draw, check and price it.
You can start pricing it the same day you send the brief.
- Drawing set
- 19 sheets
- Code review
- 28 checks
- Materials order
- 145 lines
- G-001
- G-002
- C-101
- A-101
- A-201
- A-301
- A-302
- A-401
- A-501
- A-601
- A-602
- A-701
- S-001
- S-101
- S-201
- E-101
- E-201
- P-101
- M-101
Right now, every new house waits on paperwork long before your crew can start.
With XYZ, the drawings, the code check and the order arrive together, so your office, your crew and your suppliers start from the same numbers.
You send the brief
a sketch, photos, a PDF or a few lines
You check what we read
and fix anything we got wrong
The house is drawn, checked and priced
36 milliseconds at the median3
A licensed engineer reviews and seals it
ready to file for the permit
From the brief to the plan
Drag across the sketch a designer sent in the brief for The Mangrove, one of our sample briefs, to see the floor plan XYZ drew from it.
Open this brief in the studio
Three jobs change most for builders, and the plan beside them shows each one with XYZ.
G 2
C 1
A 9
S 3
E 2
P 1
M 1
Every sheet is drawn from this plan: 2 general, 1 civil, 9 architectural, 3 structural, 2 electrical, 1 plumbing and 1 mechanical.
01
The plans
Today
A drafter and an engineer work through each house in turn, and every change sends it back to them.
With XYZ
The set is drawn as soon as you confirm the brief, and a change to the brief redraws every sheet it touches.
02
The permit
Today
One missed item at the county costs you a resubmittal and another round of waiting.
With XYZ
Every code check runs before you file, and each one tells you the section it comes from.
03
The materials
Today
Once the frame is up, the extra lumber you paid for is the pile of leftovers going to the dumpster.
With XYZ
Every quantity comes from the drawings, with cut plans, so you order what the house needs and a sensible margin, not a guess.
Here is what comes with every house, and all of it is yours to keep and send.
The full drawing set: 19 sheets for a one-story house or 24 for two stories, from the site plan to the mechanical plan
- 25 meet the code
- 3 for the engineer of record
A code review that names the section behind every check
- Roofing, insulation, stucco$39,793
- Doors and windows$24,527
- Wood and framing$20,463
- Finishes$17,543
- Concrete$14,453
- HVAC$12,230
A materials order by trade, with cut plans and waste worked out line by line
- PAGESee it in 3D
- CSVQuickBooks Online items
- CSVJobTread budget
- CSVBuildertrend estimate
- CSVHyphen SupplyPro order
- CSVLender budget, G703 style
- PAGELender package
- PAGEListing sheet
- IFCBIM model
- DXFCAD site plan
Exports for QuickBooks, JobTread and Buildertrend, and DXF and IFC files for your designer
A B, description of work C, scheduled value H, balance to finish 03 Concrete (materials) $14,453 $14,453 04 Masonry (materials) $8,035 $8,035 06 Wood and framing (materials) $20,463 $20,463 07 Roofing, insulation, stucco (materials) $39,793 $39,793 08 Doors and windows (materials) $24,527 $24,527 and 10 more trades $176,923 $176,923 A lender package for your construction loan
The sample house set
Take our sample house set with you
The Palmetto is the sample house we hand over as a whole set, drawn, checked and priced by the same engine that draws yours.
What it costs
$4,500 a sealed house
- Drawing the whole set$0
- Checking it against the code$0
- Pricing every material$0
Drawing, checking and pricing are free; you pay when you send a house for the seal.
- Reviewed and sealed by a licensed Florida engineer
- One round of county comments answered
- The set, the code review, the order and every export
Not included: survey, soil report, truss engineering by your truss maker, permit and impact fees.
$650 to build a plan from your XYZ library again on a new lot.
Questions builders ask
What can XYZ draw today?
XYZ draws one-story houses of 1,900 to 2,600 sq ft, two-story houses of 2,600 to 3,600 sq ft and rows of 3 to 6 townhomes, with hip roofs and 3 or 4 bedrooms. We draw to the Florida Building Code today, for lots in Hillsborough, Pinellas, Pasco, Polk, Manatee and Sarasota counties, at planning prices for that area. We lay out the rooms ourselves; room sizes and places in a sketch are noted for review. If your brief asks for something outside that, we tell you before we draw, so nothing about your house changes without you knowing.
Which building code do you check against?
The drawing engine checks the Florida Building Code today, in the edition in force on the day you file (the 8th, then the 9th, expected from December 31, 2026), and our code library lists the codes in force in every other state so you can see what applies where you build.
What happens to my files?
We read your brief and your plans once to do the work, and we never keep them. Share links leave out the address, the names and the lot's location.
Send us the brief for your next house, and you will see the whole set before you pay for anything.
Doing something else in real estate? See how XYZ helps the other roles
Sources, 3
- 1Fixr, Draftsman cost, January 31, 2025. How long a drafter works on a set of house plans: about 14 to more than 150 labor hours, from about 2 days to several weeks, longer when the plans change along the way.
- 2Building Science Corporation, Advanced Framing: Using Wood Efficiently (Building America Report 0201; Baczek, Yost and Finegan), August 2002. The waste factor added to a framing lumber takeoff for bad stock and errors on site: the report puts the usual choice between 5% and 15% and says detailed framing plans allow a smaller one. A US Department of Energy Building America report.
- 3XYZ Blueprint benchmark, 3,168 houses, November 21, 2026. Each of 3,168 houses (1,152 one-story, 1,152 two-story and 864 townhome buildings, under both code editions) was timed once on a laptop (AMD Ryzen 7 5700U with Radeon Graphics (16 threads), 15 GB memory, Windows 11 Home, Node v24.11.1), from the confirmed program to the full drawing set, code review and materials order; reading your brief and your browser drawing the sheets are not in this time. Savings compare each order line with the allowance a builder would usually add for that material, as our takeoff assumes it (a builder's own will differ), and count a line where the exact layout needs more as a loss. Prices are the takeoff's planning prices for Tampa Bay, not quotes. The test count is the number of written tests in our checks, all run before every push.