Skip to content

Tell us the project, your part in it and where it stands, and see what we do for you there.

01The kind of project
02Your part in it
03Where it stands

Sources, 9

  1. 1Fixr, Draftsman cost, January 31, 2025. What a drafter charges for a set of house plans in the US, about $2,000 on average for semi-custom plans of a 2,000 sq ft, two-story, 3 bedroom, 2 bath home. Fully custom plans run $2,000 to $20,000. A consumer cost guide, national figures.
  2. 2XYZ Blueprint benchmark, 3,168 houses, November 21, 2026. Each of 3,168 houses (1,152 one-story, 1,152 two-story and 864 townhome buildings, under both code editions) was timed once on a laptop (AMD Ryzen 7 5700U with Radeon Graphics (16 threads), 15 GB memory, Windows 11 Home, Node v24.11.1), from the confirmed program to the full drawing set, code review and materials order; reading your brief and your browser drawing the sheets are not in this time. Savings compare each order line with the allowance a builder would usually add for that material, as our takeoff assumes it (a builder's own will differ), and count a line where the exact layout needs more as a loss. Prices are the takeoff's planning prices for Tampa Bay, not quotes. The test count is the number of written tests in our checks, all run before every push.
  3. 3AACE International, Recommended Practice 56R-08, Cost Estimate Classification System for the Building and General Construction Industries, August 7, 2020. How far a cost estimate made by square-foot factoring (a Class 5 estimate) is expected to land from the actual cost, at 80% confidence, in building construction, residential included.
  4. 4Florida Statutes, section 553.792 (2026), 2026. What one round of corrections can add to a Florida house permit: the applicant has 10 business days to answer the department's written comments, and the department then has 10 business days to review the answer.
  5. 5PlanGrid and FMI, Construction Disconnected (2018 industry report), 2018. US construction spending that went to rework in 2018: $65 billion of the $1,304 billion forecast in the same report (the percent is our arithmetic). A survey of 599 construction leaders, 500 of them in the US and over half in commercial building, none listed as residential, by PlanGrid, a software maker, and FMI.
  6. 6PlanGrid and FMI, Construction Disconnected (2018 industry report), 2018. Time construction professionals said they spend each week on work that does not move the job forward, 35% of their hours: 5.5 hours looking for project data, 4.7 resolving conflicts and 3.9 dealing with mistakes and rework. Same survey.
  7. 7PlanGrid and FMI, Construction Disconnected (2018 industry report), 2018. Share of rework caused by poor project data and miscommunication, worldwide; in the US that came to $31.3 billion in 2018. Same survey.
  8. 8Florida Statutes, section 553.792 (2026), 2026. How long a Florida building department may take to approve, approve with conditions or deny a complete permit application for a single-family home under 7,500 sq ft (60 business days at 7,500 sq ft or more). It must flag a missing item within 5 business days. Late reviews cut the permit fee 10% a business day.
  9. 9NAHB, Government Regulation in the Price of a New Home: 2026 (Eric Lynch), June 8, 2026. How long regulation delays a land development project on average, as reported by the 94.2% of developers who said it causes delay; 93.4% of builders reported regulatory delays during construction too, averaging a little over six weeks.