A house is free to draw, check and price, and you pay for the seal.
- Draw a house$4,500a sealed houseThe engineer of record reviews the set, signs it and seals it for the permit.Start a house
- Build it again$650a plan on a new lotA plan already drawn is fitted to the next lot, every check runs again for it, and the engineer seals it for that lot.Pick a plan
- Check a set you haveFree to tryor $199 a month per company for a teamUpload a set and see what a reviewer would flag, with the sheet and the code section for each item.Check a set
Here is where a house is paid for, from the brief to the permit.
The brief
4 files
$0
You check what we read
every field, with its source
$0
The set is drawn
19 sheets
$0
The code is checked
28 checks
$0
The materials are priced
145 lines
$0
A licensed engineer reviews and seals it
ready to file for the permit
$4,500
Paid so far, for this house
$4,500
Set how many houses you build in a year, and see the seal beside what builders spend on design and engineering for a house today.
Every other role pays one price, and looking at a house a builder shares with you is free.
Design and build
Find and fund
Everyone else
Builder
$4,500 a sealed house
Drawing, checking and pricing are free; you pay when you send a house for the seal.
- Reviewed and sealed by a licensed Florida engineer
- One round of county comments answered
- The set, the code review, the order and every export
Not included: survey, soil report, truss engineering by your truss maker, permit and impact fees.
$650 to build a plan from your XYZ library again on a new lot.
How XYZ works for buildersThe tools it opens, 15 of them
- Draw a house
- What fits on a lot
- Lot yield
- Rezoning tracker
- Plan library
- Check a plan set
- Permit tracker
- Quote leveling
- Change order
- Lien waivers
- Certified payroll check
- DBE participation
- Bid package check
- License check
- Supplier rebates
Questions about paying
The answers come from the same list that sets every price, so this page and each role's own page always agree.
When is a house paid for?
Drawing, checking and pricing are free, and you pay when you send a house for the seal. The $4,500 covers the engineer's review and seal, one round of county comments answered and the set, the code review, the order and every export.
What does a house set leave out?
It leaves out the survey, soil report, truss engineering by your truss maker and permit and impact fees, which come from others.
Can I build a plan again on a new lot?
You can. $650 to build a plan from your XYZ library again on a new lot.
Do the monthly plans charge for each person?
They do not. The developer, land buyer, permit and code pro, designer or architect, commercial landlord and public works contractor plans each cover everyone on your team for one price.
Who seals the drawings?
A Florida-licensed engineer of record reviews and seals each set that is ordered.
What happens to my files?
We read your brief and your plans once to do the work, and we never keep them. Share links leave out the address, the names and the lot's location.
Not sure which one you are? Start a house for free, and you will see everything XYZ makes before you pay for anything.
Sources, 3
- 1NAHB, Cost of Constructing a Home 2024 (Eric Lynch), January 20, 2025. What builders spent on architecture and engineering for an average new single-family home, 1.5% of a $428,215 construction cost, for a 2,647 sq ft home selling for $665,298. A national survey of 41 builders in fall 2024.
- 2XYZ Blueprint benchmark, 3,168 houses, November 21, 2026. Each of 3,168 houses (1,152 one-story, 1,152 two-story and 864 townhome buildings, under both code editions) was timed once on a laptop (AMD Ryzen 7 5700U with Radeon Graphics (16 threads), 15 GB memory, Windows 11 Home, Node v24.11.1), from the confirmed program to the full drawing set, code review and materials order; reading your brief and your browser drawing the sheets are not in this time. Savings compare each order line with the allowance a builder would usually add for that material, as our takeoff assumes it (a builder's own will differ), and count a line where the exact layout needs more as a loss. Prices are the takeoff's planning prices for Tampa Bay, not quotes. The test count is the number of written tests in our checks, all run before every push.
- 3Fixr, Draftsman cost, January 31, 2025. How long a drafter works on a set of house plans: about 14 to more than 150 labor hours, from about 2 days to several weeks, longer when the plans change along the way.