Skip to content

Catch what a reviewer would ask for before you file.

Then track every review round and answer each comment letter.

Plan checkThe Mangrove, Lot 7
DWREFDWHAHUATTIC ACCESSGARAGE21'-9 3/4" x 21'-0"BATH 28'-5 3/4" x 7'-5 3/4"LAUNDRY7'-7 1/2" x 7'-5 3/4"PANTRYHALL21'-9 3/4" x 3'-3 1/2"CLBEDROOM 310'-5 3/4" x 11'-9 3/4"BEDROOM 210'-11 1/2" x 11'-9 3/4"CLDINING12'-0" x 15'-4"ENTRY PORCH7'-4" x 5'-8"FOYER7'-4" x 9'-8"KITCHEN20'-3 1/2" x 13'-9 3/4"GREAT ROOM20'-3 1/2" x 17'-9 3/4"BEDROOM 415'-8" x 9'-9 3/4"CLBATH 315'-9 3/4" x 5'-7 1/2"OWNER'S WIC5'-7 1/2" x 10'-7 1/2"OWNER'S BATH9'-9 3/4" x 10'-7 1/2"OWNER'S SUITE15'-9 3/4" x 17'-9 3/4"COVERED LANAI18'-8" x 13'-4"
Plan check
36 items
Drawing set
19 sheets
Code review
28 checks
  1. General
  2. Site
  3. Architectural
  4. Structural
  5. Electrical
  6. Plumbing
  7. Mechanical
  8. Energy

Today, once a set is filed, the permit sits with the building department until its comments come back.

  1. Only some applications pass the first review

    About 38% in Denver, across all permits1

  2. You answer each comment letter by hand

    one comment at a time

  3. Corrections are slow

    A month or more per round, in Seattle2

  4. Most houses are reviewed more than once

    About 3 review rounds in Tacoma, Washington3

With XYZ, you see what a reviewer is likely to flag while there is still time to fix it, and every deadline after you file is counted for you.

  1. You upload the set before you file

    read and checked item by item

  2. You fix what the check finds

    each item with its sheet and code section

  3. You track the rounds and answer the letters

    with every deadline counted for you

Three jobs change most for permit and code pros, and the plan beside them shows each one with XYZ.

Plan check36 items
DWREFDWHAHUATTIC ACCESSGARAGE21'-9 3/4" x 21'-0"BATH 28'-5 3/4" x 7'-5 3/4"LAUNDRY7'-7 1/2" x 7'-5 3/4"PANTRYHALL21'-9 3/4" x 3'-3 1/2"CLBEDROOM 310'-5 3/4" x 11'-9 3/4"BEDROOM 210'-11 1/2" x 11'-9 3/4"CLDINING12'-0" x 15'-4"ENTRY PORCH7'-4" x 5'-8"FOYER7'-4" x 9'-8"KITCHEN20'-3 1/2" x 13'-9 3/4"GREAT ROOM20'-3 1/2" x 17'-9 3/4"BEDROOM 415'-8" x 9'-9 3/4"CLBATH 315'-9 3/4" x 5'-7 1/2"OWNER'S WIC5'-7 1/2" x 10'-7 1/2"OWNER'S BATH9'-9 3/4" x 10'-7 1/2"OWNER'S SUITE15'-9 3/4" x 17'-9 3/4"COVERED LANAI18'-8" x 13'-4"
  • General 8
  • Site 6
  • Architectural 14
  • Structural 4
  • Electrical 1
  • Plumbing 1
  • Mechanical 1
  • Energy 1

Each item comes back fix, check or looks right, with its sheet and code section.

01

Before you file

Today

Before you file, nothing tells you whether the set is missing a product approval or a design pressure.

With XYZ

The set is read for the items plan examiners check most often, and each comes back marked fix, check or looks right, with its page and code section.

02

The documents

Today

Each building department asks for its own documents, and a missing form sends the application back.

With XYZ

The permit tracker lists the documents the building department asks for, marks what you have and what is missing, and shows which ones the XYZ set already provides.

03

The comment letters

Today

Each response has to cite the right sheet and code section, and finding both is on you.

With XYZ

Every comment in the letter is tied to the sheet and code section it points to, and for an XYZ house the project's own code check sits beside it, so your response can cite it.

Here is what comes with every permit you run, from the first check to the last letter.

  1. 01A plan check of any set, with a finding for every item
  2. 02The building department's document list, with what is in hand and what is still missing
  3. 03Review clocks counted in business days for you and the department, with the fee reduction when the department is late
  4. 04Comment letters broken into single comments, with their sheets and code sections
  5. 05Draft responses you edit and approve, printed as a response letter
  6. 06The private provider notice, with what the project already knows filled in

What it costs

$199 a month per company

  • Unlimited plan checks (fair use about 50 sets a month)Included
  • Permit tracker and comment lettersIncluded
  • Unlimited usersIncluded
A month per company$199

The plan belongs to the office rather than to one person, so whoever is handling a permit can use it.

Not included: permit and review fees.

Questions permit and code pros ask

What does the plan check cover?

It reads your set against the items building department checklists and the residential code ask for, and gives each finding its sheet and code section, so you can change the set while it is still on your desk. An item it cannot read comes back marked check, never as passing.

Which code and permit rules does it follow?

The plan check reads a set against the Florida Building Code in the edition it will be filed under, the 8th or the 9th, and the review clocks follow Florida's permit statute, counted in business days. Our code library lists the codes in force in every other state, so you can see what applies wherever you work.

What happens to my files?

We read your brief and your plans once to do the work, and we never keep them. Share links leave out the address, the names and the lot's location.

Run the next set through the plan check before it goes to the building department.

Doing something else in real estate? See how XYZ helps the other roles

Sources, 3

  1. 1Colorado Politics, Denver considers AI-powered permitting contract, February 17, 2026. Share of Denver permit applications accepted without issue, out of close to 1,000 a month; the city's goal is close to 80%. The figure covers applications generally, not only houses.
  2. 2City of Seattle Innovation Hub, AI construction permitting study, June 17, 2026. Seattle reports that applications for small residential projects (single-family homes, townhouses, accessory dwelling units) often go through several review cycles, and that each cycle adds a month or more.
  3. 3City of Tacoma, Review and track permits, September 1, 2026. How many rounds of review a new house took on average before Tacoma, Washington issued the permit, in a six-month snapshot; the median first review took 3.6 weeks and 66% met the city's 4-week target. Alterations averaged 1.4 rounds.