Connecticut

Connecticut has one State Building Code and two state fire codes that every town, city and borough must enforce as written; local governments may not adopt their own building codes. The State Building Inspector and the Codes and Standards Committee (Department of Administrative Services) adopt the building code and the State Fire Marshal adopts the fire codes. The 2022 codes (2021 I-codes, 2020 NEC) are in force; the 2026 codes (2024 I-codes, 2023 NEC) are waiting for approval by the legislature's Regulation Review Committee, and Public Act 26-58 lets the state skip the 2027 model codes until the 2030 editions.

22 codes are in force here, 21 of them checked at the source, and this page was last updated November 19, 2026.

Codes in force

Building2022 Connecticut State Building Code (2021 International Building Code portion)

Applies toEvery building and structure in the state, including state agency buildings, except detached one- and two-family dwellings and townhouses up to three stories with a separate means of egress, which follow the IRC portion. Applies to work for which a permit application was made on or after October 1, 2022.

Based on, and how far it reachesIBC, 2021 edition.Applies across the state, and local governments enforce it as written.

Local changesAppendices C, H, I and P are part of the code. Appendix P gives wind speed, ground snow load and seismic values for each of the 169 towns, and the flat roof snow load may not be taken below 30 psf. The International Fuel Gas Code and the International Property Maintenance Code are not adopted. Plans for assembly, educational, institutional, high-hazard and transient residential buildings, and for larger business, factory, mercantile, storage and apartment buildings, must be sealed by a Connecticut architect or engineer (CGS 29-276c). Buildings over the threshold limits (four stories, 60 ft tall, 150,000 sq ft, 1,000 occupants and others) need an independent structural engineering review (CGS 29-276b). Flood hazard areas are set by each town.

NextThe 2024 edition. The 2026 Connecticut State Building Code, based on the 2024 IBC, was expected to take effect July 1, 2026 but is delayed until the Legislative Regulation Review Committee approves it. Public Act 26-58 (effective October 1, 2026) gives two years to adopt a new model edition and requires no revision after the 2024 codes until the 2030 codes are published.

Adopted byState Building Inspector and Codes and Standards Committee, Department of Administrative Services; enforced by the local building official in each town.In force since October 1, 2022.

Houses2022 Connecticut State Building Code (2021 International Residential Code portion)

Applies toDetached one- and two-family dwellings and townhouses up to three stories above grade plane with a separate means of egress, and their accessory structures.

Based on, and how far it reachesIRC, 2021 edition.Applies across the state, and local governments enforce it as written.

Local changesWind speed and ground snow load come from a town-by-town table (Appendix AY); frost line depth is 42 inches statewide; seismic design category B; termite damage moderate to heavy; weathering severe. Sprinklers are not required in dwellings or townhouses (R313 amended to apply only where a system is installed). New dwellings and townhouses must have radon mitigation preparation (Appendix AF). Appendix AE covers manufactured home foundations and connections. Before a certificate of occupancy for a new building with a concrete foundation installed since October 1, 2016, the applicant must name the concrete supplier and installer, and the building official keeps the record for 50 years (CGS 29-265c).

NextThe 2024 edition. The 2024 IRC is part of the delayed 2026 State Building Code (awaiting Legislative Regulation Review Committee approval).

Adopted byState Building Inspector and Codes and Standards Committee, Department of Administrative Services; enforced by local building officials.In force since October 1, 2022.

Existing buildings2022 Connecticut State Building Code (2021 International Existing Building Code portion)

Applies toRepair, alteration, change of occupancy, addition to and relocation of existing buildings other than those under the IRC.

Based on, and how far it reachesIEBC, 2021 edition.Applies across the state, and local governments enforce it as written.

Local changesConnecticut amendments are in the 2022 State Building Code document.

NextThe 2024 edition. The 2024 IEBC is part of the delayed 2026 State Building Code.

Adopted byState Building Inspector and Codes and Standards Committee, Department of Administrative Services.In force since October 1, 2022.

Energy, houses2022 Connecticut State Building Code (2021 International Energy Conservation Code portion), residential provisions

Applies toEnergy efficiency of new houses and low-rise residential buildings, additions and alterations.

Based on, and how far it reachesIECC, 2021 edition.Applies across the state, and local governments enforce it as written.

Local changesState amendments are in the 2022 State Building Code document.

NextThe 2024 edition. The 2024 IECC is part of the delayed 2026 State Building Code.

Adopted byState Building Inspector and Codes and Standards Committee, Department of Administrative Services.In force since October 1, 2022.

Energy, other buildings2022 Connecticut State Building Code (2021 IECC portion), commercial provisions

Applies toEnergy efficiency of commercial buildings and residential buildings over three stories.

Based on, and how far it reachesIECC and ASHRAE 90.1 (2021 IECC; ASHRAE 90.1-2019).Applies across the state, and local governments enforce it as written.

Local changesState amendments are in the 2022 State Building Code document.

NextThe 2024 edition. The 2024 IECC is part of the delayed 2026 State Building Code.

Adopted byState Building Inspector and Codes and Standards Committee, Department of Administrative Services.In force since October 1, 2022.

Fire2022 Connecticut State Fire Prevention Code

Applies toFire prevention in buildings and premises: hazardous materials, flammable liquids, gas equipment and piping, oil burners, fire protection system maintenance, fire department access, special events. For one- and two-family dwellings and townhouses it covers only smoke and carbon monoxide alarms.

Based on, and how far it reachesNFPA 1, 2021 edition.Applies across the state, and local governments enforce it as written.

Local changesAdopts NFPA 1 with Annexes A, C and F and Connecticut amendments. Took effect with the 2022 codes; the effective date was not confirmed on the fire code pages.

NextThe 2024 edition. The 2026 Fire Prevention Code is expected to adopt the 2024 NFPA 1; it is waiting for Legislative Regulation Review Committee approval with the building code.

Adopted byState Fire Marshal (Department of Administrative Services); enforced by local fire marshals.

Fire2022 Connecticut State Fire Safety Code, Part III (new construction)

Applies toFire safety of new buildings, renovations and changes of use for which a permit was issued on or after January 1, 2006. Does not apply to one- and two-family dwellings and townhouses except for smoke and carbon monoxide alarms. Local fire marshals must certify plans before a building permit is issued.

Based on, and how far it reachesIFC, 2021 edition.Applies across the state, and local governments enforce it as written.

Local changesAdopts the 2021 IFC with Connecticut amendments. Took effect with the 2022 codes; the effective date was not confirmed on the fire code pages.

NextThe 2024 edition. The 2026 Fire Safety Code is expected to adopt the 2024 IFC; it is waiting for Legislative Regulation Review Committee approval.

Adopted byState Fire Marshal and the Codes and Standards Committee; enforced by local fire marshals.

Life safety2022 Connecticut State Fire Safety Code, Part IV (existing buildings)

Applies toExisting buildings and occupancies for which a permit was issued before January 1, 2006. Not one- and two-family dwellings except for smoke and carbon monoxide alarms.

Based on, and how far it reachesNFPA 101, 2021 edition.Applies across the state, and local governments enforce it as written.

Local changesAdopts NFPA 101 with annexes and Connecticut amendments.

NextStays on the 2021 edition. DAS says the 2026 codes keep NFPA 101 at the 2021 edition.

Adopted byState Fire Marshal and the Codes and Standards Committee; enforced by local fire marshals.

Plumbing2022 Connecticut State Building Code (2021 International Plumbing Code portion)

Applies toPlumbing systems connected to a water or sewage system, and medical gas systems. The International Private Sewage Disposal Code is not adopted (septic systems are under the Public Health Code).

Based on, and how far it reachesIPC, 2021 edition.Applies across the state, and local governments enforce it as written.

Local changesConnecticut amendments are in the 2022 State Building Code document.

NextThe 2024 edition. The 2024 IPC is part of the delayed 2026 State Building Code.

Adopted byState Building Inspector and Codes and Standards Committee, Department of Administrative Services.In force since October 1, 2022.

Mechanical2022 Connecticut State Building Code (2021 International Mechanical Code portion)

Applies toHeating, ventilating, air conditioning and refrigeration systems in buildings under the IBC.

Based on, and how far it reachesIMC, 2021 edition.Applies across the state, and local governments enforce it as written.

Local changesConnecticut amendments are in the 2022 State Building Code document.

NextThe 2024 edition. The 2024 IMC is part of the delayed 2026 State Building Code.

Adopted byState Building Inspector and Codes and Standards Committee, Department of Administrative Services.In force since October 1, 2022.

Fuel gasNational Fuel Gas Code and Liquefied Petroleum Gas Code, as adopted in the 2022 Connecticut State Fire Safety and Fire Prevention Codes

Applies toGas piping from the point of delivery to appliances, installation of residential and commercial gas appliances, and LP gas storage. The International Fuel Gas Code is not adopted; references to it are read as NFPA 2, NFPA 54 and NFPA 58.

Based on, and how far it reachesNFPA 54 and NFPA 58, 2021 edition.Applies across the state, and local governments enforce it as written.

Adopted byState Fire Marshal (fire codes) with the State Building Inspector.In force since October 1, 2022.

Electrical2022 Connecticut State Building Code (2020 National Electrical Code portion)

Applies toElectrical installations in all buildings.

Based on, and how far it reachesNFPA 70, 2020 edition.Applies across the state, and local governments enforce it as written.

Local changesConnecticut amendments are in the 2022 State Building Code document.

NextThe 2023 edition. The 2023 NEC is part of the delayed 2026 State Building Code.

Adopted byState Building Inspector and Codes and Standards Committee, Department of Administrative Services.In force since October 1, 2022.

Accessibility2022 Connecticut State Building Code (ICC A117.1-2017 portion and IBC Chapter 11)

Applies toAccessible design of buildings and facilities covered by the IBC, plus Type B units in dwellings as amended.

Based on, and how far it reachesICC A117.1, 2017 edition.Applies across the state, and local governments enforce it as written.

Local changesConnecticut amends A117.1 in the 2022 State Building Code. The federal ADA applies separately.

NextStays on the 2017 edition. DAS lists ICC A117.1-2017 for the 2026 codes as well.

Adopted byState Building Inspector and Codes and Standards Committee, Department of Administrative Services.In force since October 1, 2022.

Elevators and escalatorsConnecticut Safety Code for Elevators and Escalators (Regulations 29-192-4e)

Applies toElevators, escalators, dumbwaiters, moving walks, private residence elevators, tramways and construction personnel hoists.

Based on, and how far it reachesASME A17.1, 2013 edition.Applies across the state, and local governments enforce it as written.

Adopted byOffice of the State Building Inspector (DAS) certifies and inspects; work is done by state-licensed elevator contractors.In force since January 3, 2018.

Pools and spas2022 Connecticut State Building Code (2021 International Swimming Pool and Spa Code portion)

Applies toPublic and residential pools, spas and hot tubs.

Based on, and how far it reachesISPSC, 2021 edition.Applies across the state, and local governments enforce it as written.

Local changesConnecticut amends the flood hazard area provisions (section 304.2) among others.

NextThe 2024 edition. The 2024 ISPSC is part of the delayed 2026 State Building Code.

Adopted byState Building Inspector and Codes and Standards Committee, Department of Administrative Services.In force since October 1, 2022.

Property maintenanceLocal property maintenance codes (the IPMC is not adopted by the state)

Applies toThe State Building Code says the International Property Maintenance Code is not adopted by the state; property maintenance follows the State Building Code, the State Fire Prevention Code and any property maintenance code a town adopts.

Based on, and how far it reachesEach local government's own code; the edition varies by town.Each city or county chooses whether to adopt it, and which edition.

Adopted byTowns, cities and boroughs.

Sprinkler rules for houses2022 Connecticut State Building Code, IRC section R313 as amended

Applies toAutomatic sprinklers are not required in new one- and two-family dwellings or townhouses; where an owner installs one it must follow IRC P2904 or NFPA 13D.

Based on, and how far it reachesIRC R313, 2021 edition.Applies across the state, and local governments enforce it as written.

Local changesR313.1 and R313.2 rewritten so they apply only when a system is installed; R313.1.1 and R313.2.1 deleted.

Adopted byState Building Inspector and Codes and Standards Committee, Department of Administrative Services.In force since October 1, 2022.

Manufactured homes2022 Connecticut State Building Code, IRC Appendix AE (manufactured housing used as dwellings)

Applies toFoundations and utility connections for new manufactured homes, and additions, alterations and repairs to existing ones. The homes themselves are built to the federal HUD code.

Based on, and how far it reachesIRC Appendix AE, 2021 edition.Applies across the state, and local governments enforce it as written.

Local changesAppendix AE applies only to the installation and to work on existing homes, not to the design of the home.

Adopted byLocal building officials under the State Building Code.In force since October 1, 2022.

Modular and factory-built buildingsPrefabricated assemblies and modular housing (State Building Code sections 111.7 and R110.7)

Applies toEvery prefabricated assembly, including modular housing, needs a certificate of approval from an approved agency unless all its parts can be inspected on site; the local building official inspects placement and the connections to utilities, water and septic systems.

Based on, and how far it reachesThe state's own code (2022 State Building Code).Applies across the state, and local governments enforce it as written.

Adopted byApproved third-party agencies for the factory work; local building officials on site.In force since October 1, 2022.

Flood rules beyond the federal minimumFlood hazard areas established by each town (State Building Code 1612.3 as amended)

Applies toThe State Building Code leaves the establishment of flood hazard areas to each town, city or borough; any freeboard above the base flood elevation beyond the IBC and IRC (ASCE 24) comes from the local flood ordinance.

Based on, and how far it reachesEach local government's own code; the edition varies by town.Each city or county chooses whether to adopt it, and which edition.

Adopted byTowns, cities and boroughs (National Flood Insurance Program communities).

Structural loads2022 Connecticut State Building Code, Chapter 16 and Appendix P (municipality-specific structural design parameters)

Applies toDesign loads for all buildings. Wind speeds, ground snow loads and seismic accelerations are taken from the Appendix P table for each town instead of the IBC maps.

Based on, and how far it reachesASCE 7 with state tables, 2016 edition.Applies across the state, and local governments enforce it as written.

Local changesFlat and sloped roof snow loads may not be taken below 30 psf; a new building within 20 ft of a lower existing building needs an engineer's statement on snow drift on the existing roof; roof rain loads use a design rainfall of 6.0 inches (twice the 100-year hourly rate). The ASCE 7 edition is the one the 2021 IBC references (2016); it was not confirmed in the Connecticut text.

Adopted byState Building Inspector and Codes and Standards Committee, Department of Administrative Services.In force since October 1, 2022.

Boilers and pressure vesselsConnecticut Safety Code for Boilers and Hot Water Heaters

Applies toRegistration or certification and inspection of certain boilers and hot water heaters.

Based on, and how far it reachesThe state's own code; the edition is not confirmed.Applies across the state, and local governments enforce it as written.

Adopted byOffice of the State Building Inspector, Department of Administrative Services.

Not adopted here, or not found yet

Green building and stretch codesNo statewide green building or stretch energy code for private buildingsNo code of this kind is adopted

Applies toNo IgCC or stretch code is adopted for private construction. High performance standards for state-funded buildings exist under state law but were not confirmed.

Adopted byNot applicable.

Wildland-urban interfaceNo wildland-urban interface codeNo code of this kind is adopted

Applies toThe IWUIC is not adopted in Connecticut.

Adopted byNot applicable.

Who designs, seals and builds

Architect
A Connecticut architect is not needed for a residential building for up to two families and its garage or accessory buildings, for farm buildings, or for any building (with any addition) of less than 5,000 sq ft total area, except assembly, educational, institutional, high-hazard and transient residential (hotel, motel, dormitory) buildings, which need an architect at any size. Engineers may do architectural work incidental to their engineering. Separately, the building code (CGS 29-276c) requires plans for assembly, educational, institutional, high-hazard and transient residential buildings of any size, business, factory, mercantile and storage buildings of three stories or more or over 30,000 sq ft, and apartment buildings over 16 units or 24,000 sq ft to be sealed by a licensed architect or engineer, who must also review shop drawings and observe construction.CGS 20-288 to 20-298c (Chapter 390); CGS 29-276cChecked at the source
Engineer
The sealing rule in CGS 29-276c applies to architects and professional engineers alike. Structures over the threshold limits (four stories, 60 ft tall, a 150 ft clear span, 150,000 sq ft or 250,000 sq ft for storage, 1,000 occupants, institutional uses with 150 beds, hotels with 200 rooms, apartments with 100 units, garages for 1,000 cars) need an independent structural engineering consultant to review the structural plans, and the architect, engineer of record and general contractor must sign a statement of professional opinion. Engineered designs under the IRC must be certified by a registered design professional.CGS 29-276b, 29-276c; Chapter 391 (engineers)Checked at the source
Contractor
There is no general building contractor license. The Department of Consumer Protection registers home improvement contractors and new home construction contractors and licenses the trades (electrical, plumbing and piping, heating and cooling, sheet metal, fire protection sprinkler, elevator, solar and others, with limited and unlimited contractor and journeyperson levels). DCP also lists a major contractor registration.CGS Chapters 393 (trades), 399a (new home construction), 400 (home improvement)Checked at the source

Design loads and hazards

Wind
Basic design wind speed is set per town in Appendix P: 115 to 130 mph for Risk Category II (105 to 120 mph for Category I, 125 to 140 mph for Category III, 130 to 145 mph for Category IV). 147 of the 169 towns are in the hurricane-prone region, and 24 shoreline towns (Greenwich to Stonington, including Bridgeport, New Haven and New London) are wind-borne debris regions for some risk categories.
Snow
Ground snow load is 30 to 40 psf by town (Appendix P); 40 psf applies in 18 towns in the northwest hills (Canaan, Norfolk, Salisbury, Torrington and others) and the northeast corner (Putnam, Thompson, Woodstock and others). Flat and sloped roof snow loads may not be taken below 30 psf.
Seismic
Seismic Design Category B for houses (IRC table). Town values of Ss range from about 0.12 to 0.27 g and S1 from 0.051 to 0.059 g (Appendix P).
Frost depth
Frost line depth 42 inches statewide (IRC Table R301.2 as amended).
Flood
Flood hazard areas and any freeboard are set by each town's flood ordinance; the state code adds none of its own. Coastal towns have V and Coastal A zones.
Other hazards
Termite damage moderate to heavy; weathering severe. New detached one- and two-family dwellings and townhouses need radon mitigation preparation (IRC Appendix AF as amended). For concrete foundations installed since October 1, 2016, the supplier and installer must be documented before a certificate of occupancy (CGS 29-265c).

Permits

Who issues them
The local building official in each of the 169 towns issues building permits and certificates of occupancy; zoning approval and, for buildings under the Fire Safety Code, the local fire marshal's written certification are needed first. State agency projects that are exempt under CGS 29-252a are reviewed by the State Building Inspector.
Review time limits
The building official must examine an application and issue or deny the permit within 30 days of filing (CGS 29-263); plans must go to the building official and the local fire marshal at the same time to meet that limit.
Private review
No general private plan review or inspection in place of the town. Buildings over the threshold limits must have an independent structural engineering consultant review the structural plans (CGS 29-276b); special inspections follow IBC Chapter 17.

Where to read the codes, and who to ask

Not found yet

  • Effective date of the 2026 Connecticut codes (2024 I-codes, 2023 NEC, 2024 NFPA 1): DAS says they await Legislative Regulation Review Committee approval; no date was published as of this check.
  • Exact effective date of the 2022 Fire Safety and Fire Prevention Codes was not confirmed on an official page (they took effect with the 2022 building code).
  • Edition of the codes adopted in the Safety Code for Boilers and Hot Water Heaters was not found.
  • High performance building standards for state-funded projects, and any green code, are not confirmed.
  • The wildland and green rows are based only on the ICC adoption chart, in a copy hosted by MiTek.
  • State requirements for manufactured home installers and the CT DEEP flood management rules for state-funded work are not confirmed.