Guam adopts its codes by statute. The Guam Building Code is the 2009 International Building Code with the related 2009 I-codes (residential, existing, plumbing, mechanical, fuel gas, private sewage), enacted in 21 GCA Chapter 67 by Public Law 30-199 (2010), plus the 2009 International Fire Code (10 GCA Chapter 73) and the 2017 Guam Tropical Energy Code, in force since January 2023. The Department of Public Works issues building permits under the Building Law of Guam (21 GCA Chapter 66), the Guam Fire Department enforces the fire code, and the Guam Building Code Council reviews proposed updates and hears appeals; no move to a newer IBC edition was found.

15 codes are in force here, 13 of them checked at the source, and this page was last updated November 19, 2026.

Codes in force

BuildingGuam Building Code: International Building Code, 2009 edition (21 GCA § 67101)

Applies toAll buildings and structures in Guam, with IBC Appendices C, E, F, G, H, I, J and K adopted.

Based on, and how far it reachesIBC, 2009 edition.Applies across the territory, and local governments enforce it as written.

Local changesEnacted by P.L. 30-199 (September 21, 2010), replacing the Uniform Building Code. P.L. 33-192 (December 14, 2016) replaced certain 2009 IBC provisions with 2015 IBC text (amended by P.L. 34-031, July 13, 2017). P.L. 35-145 (January 22, 2021) points IBC chapter 13 (energy) to the 2017 Guam Tropical Energy Code. Where 21 GCA § 66212 of the Building Law conflicts with the adopted codes, the Building Law prevails (P.L. 36-033, June 11, 2021). The full IBC is not printed in the Guam Code; amendments must be made available free through DPW and the Guam Fire Department.

NextNewer IBC edition. The Guam Building Code Council reviews proposed updates and amendments; no adoption of the 2018, 2021 or 2024 IBC was found. FEMA's June 2025 tracking lists Guam on the 2009 IBC and IRC.

Adopted byDepartment of Public Works (building official); Guam Building Code Council (review board and appeals board); I Liheslaturan Guåhan (enacts code updates).

HousesInternational Residential Code, 2009 edition (21 GCA § 67101.5)

Applies toOne- and two-family dwellings and townhouses within the IRC's scope, with Appendices A, B, C, D, G, I, J, K, M, O, P and Q adopted.

Based on, and how far it reachesIRC, 2009 edition.Applies across the territory, and local governments enforce it as written.

Local changesAdded by P.L. 30-199 (September 21, 2010). Energy compliance may follow the 2017 Guam Tropical Energy Code or IRC chapter 11 (N1101.2 as amended by P.L. 35-145).

Adopted byDepartment of Public Works.

Existing buildingsInternational Existing Building Code, 2009 edition (21 GCA § 67101.6)

Applies toRepairs, alterations, additions and changes of occupancy of existing buildings, with all appendices.

Based on, and how far it reachesIEBC, 2009 edition.Applies across the territory, and local governments enforce it as written.

Local changesEnergy provisions point to the 2017 Guam Tropical Energy Code; Level 1, 2 and 3 alterations need meet its energy rules only for the new work (P.L. 35-145).

Adopted byDepartment of Public Works.

Energy, houses2017 Guam Tropical Energy Code (21 GCA § 67101.7)

Applies toAll residential construction (P.L. 35-145:10). Houses may instead comply with IRC chapter 11.

Based on, and how far it reachesThe territory's own code, 2017.Applies across the territory, and local governments enforce it as written.

Local changesApproved by the Guam Building Code Council on February 25, 2020 and enacted by P.L. 35-145 (January 22, 2021), effective two years after enactment. The code text is printed as an appendix to 21 GCA Chapter 67.

Adopted byDepartment of Public Works; Guam Building Code Council.In force since January 22, 2023.

Energy, other buildings2017 Guam Tropical Energy Code (21 GCA § 67101.7)

Applies toAll non-residential construction and renovations; replaces IBC chapter 13 and governs HVAC and water heating efficiency under the IMC, IFGC and IPC as amended.

Based on, and how far it reachesThe territory's own code, 2017.Applies across the territory, and local governments enforce it as written.

Local changesEnacted by P.L. 35-145 (January 22, 2021), effective two years after enactment.

Adopted byDepartment of Public Works; Guam Building Code Council.In force since January 22, 2023.

FireInternational Fire Code, 2009 edition (10 GCA § 73111)

Applies toFire safety in new and existing buildings, with Appendices B, C, D, E, F, G, H and I. The IFC is part of the Guam Building Code as defined in 21 GCA § 67101.9.

Based on, and how far it reachesIFC, 2009 edition.Applies across the territory, and local governments enforce it as written.

Local changesAdopted by P.L. 30-199 (September 21, 2010). P.L. 33-192 (December 14, 2016) replaced certain provisions with 2015 IFC text; P.L. 34-031 (July 13, 2017) bans the release, sale and import of sky lanterns (new IFC 308.6).

Adopted byGuam Fire Department.

PlumbingInternational Plumbing Code, 2009 edition (21 GCA § 67101.3)

Applies toPlumbing in all buildings, with Appendices C, E and F.

Based on, and how far it reachesIPC, 2009 edition.Applies across the territory, and local governments enforce it as written.

Local changesP.L. 33-192 (2016) amended IPC § 416.5; P.L. 35-145 ties equipment efficiency and hot water piping to the 2017 Guam Tropical Energy Code.

Adopted byDepartment of Public Works.

MechanicalInternational Mechanical Code, 2009 edition (21 GCA § 67101.2)

Applies toHeating, ventilation and air conditioning, with Appendix A.

Based on, and how far it reachesIMC, 2009 edition.Applies across the territory, and local governments enforce it as written.

Local changesEnergy use and duct insulation follow the 2017 Guam Tropical Energy Code (P.L. 35-145).

Adopted byDepartment of Public Works.

Fuel gasInternational Fuel Gas Code, 2009 edition (21 GCA § 67101.1)

Applies toFuel gas piping and appliances, with all appendices.

Based on, and how far it reachesIFGC, 2009 edition.Applies across the territory, and local governments enforce it as written.

Adopted byDepartment of Public Works.

OtherInternational Private Sewage Disposal Code, 2009 edition (21 GCA § 67101.4)

Applies toOn-site sewage disposal systems, with Appendices A and B.

Based on, and how far it reachesIPSDC, 2009 edition.Applies across the territory, and local governments enforce it as written.

Adopted byDepartment of Public Works.

ElectricalElectrical installations: current edition of the National Electrical Code (21 GCA § 67103)

Applies toDesign and construction of electrical installations. The statute (1972) accepts the current edition of the NEC as the recognized standard; which edition DPW applies in practice was not confirmed.

Based on, and how far it reachesNFPA 70, current edition (the statute names no year).Applies across the territory, and local governments enforce it as written.

Adopted byDepartment of Public Works.

Elevators and escalatorsElevator installations (21 GCA Chapter 67, Article 2)

Applies toNew and existing elevators, dumbwaiters, escalators, moving walks and manlifts must be reasonably safe and conform to ASME A17.1, A17.3 and A18.1; DPW commissions elevator inspectors and issues permits to operate.

Based on, and how far it reachesASME A17.1, A17.3, A18.1; the statute names no edition.Applies across the territory, and local governments enforce it as written.

Local changesBecause of frequent power outages and earthquakes, each elevator car must have retainer plates and counterweight guide shoes and a device that stops the car at the nearest floor if the counterweight leaves its rails (§ 67219).

Adopted byDepartment of Public Works.

Boilers and pressure vesselsBoiler installation (21 GCA Chapter 67, Article 3)

Applies toDesign, construction, installation, inspection, operation and repair of boilers. Exempt: boilers under federal jurisdiction, household boilers, automobile boilers, and boilers at 15 psi or less.

Based on, and how far it reachesASME Boiler and Pressure Vessel Code; the statute names no edition.Applies across the territory, and local governments enforce it as written.

Adopted byDepartment of Public Works (inspection rules and safety orders).

AccessibilityAccessibility provisions of the 2009 IBC as adopted

Applies toAccessibility in buildings under the Guam Building Code; federal ADA and Fair Housing rules also apply (see the federal page). The A117.1 edition referenced was not confirmed; one public member of the Guam Building Code Council must be familiar with barrier-free architecture.

Based on, and how far it reachesIBC chapter 11 and ICC A117.1 (2009 IBC).Applies across the territory, and local governments enforce it as written.

Adopted byDepartment of Public Works.

Structural loadsStructural loads under the 2009 IBC

Applies toWind, seismic and other design loads. No Guam-specific basic wind speed or seismic amendment was found in Chapters 66 and 67.

Based on, and how far it reachesASCE 7-05 (referenced by the 2009 IBC; not confirmed in Guam's text).Applies across the territory, and local governments enforce it as written.

Adopted byDepartment of Public Works.

Not yet checked at the source

Not adopted here, or not found yet

Property maintenanceIPMC for hotel-zoned properties (21 GCA Chapter 66, Article 8): takes effect June 3, 2027No code of this kind is adopted

Applies toNot yet in force. P.L. 38-127 (June 3, 2026) directs DPW to adopt the International Property Maintenance Code, in whole or in part, for buildings, structures, parking lots and green areas on Hotel Zoned (H) properties, with civil penalties of $25 to $5,000 per violation, codified in Title 29 of the Guam Administrative Rules.

Based on, and how far it reachesIPMC.

NextIPMC (edition to be chosen by DPW), expected June 3, 2027. The article takes effect one year after enactment; requests to implement or amend come by resolution of the Guam Visitors Bureau board or DPW.

Adopted byDepartment of Public Works; Guam Visitors Bureau.

Sprinkler rules for housesHouse sprinkler rule: not confirmedNot found

Applies toThe 2009 IRC as adopted includes R313; whether Guam amended or deleted it, or whether the 2016 updates (P.L. 33-192) changed it, was not confirmed.

Based on, and how far it reachesIRC R313.

Adopted byDepartment of Public Works.

Not yet checked at the source
Flood rules beyond the federal minimumFlood rules: not confirmedNot found

Applies toTitle 21 contains a Guam Flood Survey and Mitigation Plan (§ 681201), and IBC Appendix G (flood-resistant construction) is adopted with the 2009 IBC; Guam's floodplain management rules and any freeboard were not confirmed.

Based on, and how far it reachesThe territory's own code.

Not confirmed yet: who adopts it.

Life safetyLife Safety Code: not confirmedNot found

Applies toNo adoption of NFPA 101 was found in 10 GCA Chapter 73 or 21 GCA Chapter 67; other titles are not confirmed.

Based on, and how far it reachesNFPA 101.

Not confirmed yet: who adopts it.

Not yet checked at the source
Manufactured homesManufactured home installation: not confirmedNot found

Applies toThe federal HUD Code governs construction of manufactured homes (see the federal page); Guam's installation rules or HUD's role were not confirmed.

Based on, and how far it reachesHUD Code (24 CFR 3280, 3285).

Adopted byHUD; Guam agency not confirmed.

Not yet checked at the source
Pools and spasPool code: not confirmedNot found

Applies toNo adoption of the ISPSC was found; pools may fall under the 2009 IBC and IRC appendices as adopted.

Based on, and how far it reachesISPSC.

Not confirmed yet: who adopts it.

Not yet checked at the source

Who designs, seals and builds

Architect
Architects, engineers, landscape architects and land surveyors are licensed by the Guam Board of Registration for Professional Engineers, Architects and Land Surveyors (PEALS) under 22 GCA Chapter 32. For documents for an individual single-family dwelling, a two-family dwelling or two-family dwellings in a subdivision, the seal of a civil professional engineer or of an architect is sufficient (§ 32116); the exemption clause (§ 32126) covers temporary permits for out-of-territory professionals, employees under supervision and construction management work, with no owner-builder or house exemption. Engineering plans and computations filed with a permit application must bear the signature of the engineer or architect responsible for the design (21 GCA § 66206). Architects from elsewhere need an NCARB certificate for a temporary permit.22 GCA §§ 32116, 32126; 21 GCA § 66206Checked at the source
Engineer
Seals are required by branch (22 GCA § 32116): structural work on buildings of 3 stories or less (stories up to 12 feet) needs a structural or civil engineer's seal, and on taller buildings a structural engineer's seal; mechanical work, including plumbing and air conditioning, a mechanical engineer's seal; electrical work an electrical engineer's seal; fire sprinkler designs a fire protection engineer's seal. Houses and duplexes are the exception noted above (civil engineer or architect).22 GCA § 32116Checked at the source
Contractor
The Contractors License Board licenses contractors, including subcontractors and specialty contractors, under 21 GCA Chapter 70 (reenacted by P.L. 30-011, April 17, 2009), with classifications such as licensed general building contractor.21 GCA Chapter 70Checked at the source

Design loads and hazards

Wind
No Guam-specific basic wind speed was found in 21 GCA Chapters 66 and 67; the 2009 IBC's wind provisions apply. The certificate of occupancy must state whether a structure is a fully-concrete dwelling installed with typhoon shutters (21 GCA § 66303).
Seismic
USGS web services for Hagatna at the default site class: ASCE 7-16 SS 2.82 g and S1 0.70 g (site class D, SDS 1.88 g); ASCE 7-22 SDS 2.3 g and Seismic Design Category D. Elevators need earthquake retainers and counterweight detection (21 GCA § 67219).
Flood
IBC Appendix G is adopted; Title 21 contains a Guam Flood Survey and Mitigation Plan (§ 681201). Floodplain rules were not confirmed.
Other hazards
The 2009 IBC as adopted is used for typhoon and earthquake design; no territorial termite, radon or tsunami rule was checked.

Not confirmed for this place yet: snow, frost depth.

Permits

Who issues them
The Department of Public Works building official issues building permits and certificates of occupancy under the Building Law of Guam (21 GCA Chapter 66), through the multi-agency Business License and Permit Center at the DPW compound in Upper Tumon, where the Guam Fire Department, Guam EPA, Land Management and Public Health also sign off.
Review time limits
No fixed plan review deadline was found: the building official must promptly examine each application (21 GCA § 66207). Appeals from the building official go to the Territorial Land Use Commission within 15 calendar days (21 GCA § 66607); the Guam Building Code Council also hears disputes over how the code is applied (§ 67101.9).
Private review
Yes, by contract: DPW's Building Permits and Design Analysis Section may contract licensed Guam architects and engineers, chosen in rotation from an approved list, for plan reviews and inspections, paid from the DPW Building and Design Fee Account rather than the General Fund (21 GCA § 66409).

Where to read the codes, and who to ask

Not found yet

  • Basic wind speed used on Guam (ASCE 7 edition applied, any local typhoon wind requirement) not confirmed.
  • Guam floodplain management rules, NFIP status and any freeboard not confirmed.
  • House sprinkler rule (IRC R313) status, accessibility standard edition, NFPA 101, pools, green, wildland and modular programs not confirmed.
  • Which NEC edition DPW enforces in practice under the 'current edition' statute not confirmed.
  • Effective date of the 2009 IBC adoption under P.L. 30-199 (earlier laws set October 1, 2010 before being repealed) not confirmed.
  • Whether the Guam Building Code Council has a newer IBC edition under review not found.
  • The compiled text of 21 GCA Chapter 67 is dated November 29, 2022; later amendments, if any, would not show there (the Title 21 table of contents is current through P.L. 38-138, September 1, 2026).