Northern Mariana Islands
The Commonwealth of the Northern Mariana Islands adopts the IBC by statute: Public Law 21-14 (signed in December 2019) made the International Building Code, starting with the 2018 edition, the Commonwealth's building code, and the Department of Public Works regulations (NMIAC § 155-10.1, amended July 28, 2020) adopt the 2018 IBC with its family of codes, including the IRC, plus the 2014 CNMI Tropical Energy Code and local wind and earthquake minimums. The DPW Building Safety Code Division reviews plans, issues permits and inspects all commercial and residential construction; the Building Safety Official may adopt newer editions by regulation, but none was found.
10 codes are in force here, 7 of them checked at the source, and this page was last updated November 19, 2026.
Codes in force
BuildingCommonwealth Building Safety Code: International Building Code, 2018 edition (2 CMC § 7142; NMIAC § 155-10.1-601)
Applies toAll buildings and structures in the Commonwealth (Saipan, Tinian, Rota and the other islands), with IBC Appendices C, E, F, G, H, I, J, K, L and M.
Based on, and how far it reachesIBC, 2018 edition.Applies across the territory, and local governments enforce it as written.
Local changesP.L. 21-14 took effect 180 days after the Governor's approval in December 2019; DPW's implementing amendments were adopted July 28, 2020 (42 Com. Reg. 43713). The Building Safety Code and its regulations prevail over the IBC where they conflict; IBC fees, inspections and certificates apply only if specifically adopted by regulation (2 CMC § 7145). Local minimums: design wind of at least 175 mph and Seismic Zone 4 (NMIAC § 155-10.1-615). Before P.L. 21-14 the Commonwealth used a code based on 2009 editions adopted by regulation; the Building Safety Code dates from P.L. 6-45 (1990), which first adopted the Uniform Building Code and the CABO code.
NextNewer IBC edition. The Building Safety Official may adopt updates and new editions of the IBC by regulation under the Administrative Procedure Act, with public notice (2 CMC § 7142(b)); no adoption of the 2021 or 2024 IBC was found.
Adopted byDepartment of Public Works, Building Safety Code Division (Building Safety Official).
HousesInternational Residential Code, 2018 edition (as part of the ICC family of codes adopted by NMIAC § 155-10.1-601)
Applies toOne- and two-family dwellings and townhouses within the IRC's scope. The regulation adopts the 2018 IBC 'which includes its ICC Family of codes such as the International Residential Code and energy codes'.
Based on, and how far it reachesIRC, 2018 edition.Applies across the territory, and local governments enforce it as written.
Local changesSingle-family residential site plans need not show parking layouts; structures in a flood zone must show the finish floor elevation referenced to a vertical datum (NMIAC § 155-10.1-120). Regulation amendments adopted in the Commonwealth Register on July 28, 2020 (42 Com. Reg. 43713); the exact effective date was not confirmed.
Adopted byDepartment of Public Works, Building Safety Code Division.
Energy, housesCNMI Tropical Energy Code 2014 (NMIAC § 155-10.1-605)
Applies toEnergy efficiency of buildings; the Model Tropical Energy Code 2014, prepared for the CNMI, Guam, Hawaii, Puerto Rico and the Virgin Islands, is adopted as part of the 2018 IBC. Apparent conflicts with the IBC are resolved in writing by the Building Safety Official.
Based on, and how far it reachesThe territory's own code, 2014.Applies across the territory, and local governments enforce it as written.
Local changesDPW implemented the 2014 revised Tropical Energy Code by notice of August 28, 2014 (36 Com. Reg. 35397), to align with ASHRAE 90.1-2007 and 90.1-2010 and the 2009 and 2012 IECC; the 2020 amendments attached it to the 2018 IBC. Regulation amendments adopted in the Commonwealth Register on July 28, 2020 (42 Com. Reg. 43713); the exact effective date was not confirmed.
NextNewer Tropical Energy Code or IECC. The Building Safety Official may adopt later versions (§ 155-10.1-605(c)); none found.
Adopted byDepartment of Public Works, Building Safety Code Division.
Energy, other buildingsCNMI Tropical Energy Code 2014 (NMIAC § 155-10.1-605)
Applies toEnergy efficiency of commercial and other buildings under the 2018 IBC.
Based on, and how far it reachesThe territory's own code, 2014.Applies across the territory, and local governments enforce it as written.
Local changesAligned with ASHRAE 90.1-2007 and 90.1-2010 (August 28, 2014 notice). Regulation amendments adopted in the Commonwealth Register on July 28, 2020 (42 Com. Reg. 43713); the exact effective date was not confirmed.
Adopted byDepartment of Public Works, Building Safety Code Division.
Structural loadsEarthquake and typhoon standards (NMIAC § 155-10.1-615)
Applies toEvery building and structure under the Building Safety Code must be designed for wind of at least 175 mph, and structures that must meet earthquake requirements must be designed to Seismic Zone 4 standards. The regulation reads the 1990 statutory language (2 CMC § 7146 on earthquakes and the typhoon provision) as minimums, not ceilings.
Based on, and how far it reachesThe territory's own code (NMIAC § 155-10.1-615).A minimum across the territory that local governments may add to.
Local changesRegulation amendments adopted in the Commonwealth Register on July 28, 2020 (42 Com. Reg. 43713); the exact effective date was not confirmed.
Adopted byDepartment of Public Works, Building Safety Code Division.
Flood rules beyond the federal minimumFlood-resistant construction (IBC Appendix G as adopted by P.L. 21-14)
Applies toConstruction in flood hazard areas under IBC Appendix G; site plans for structures in a flood zone must give the finish floor elevation referenced to a vertical datum. The Building Safety Code Division has partial responsibility for enforcing flood management laws. Freeboard above the federal minimum was not confirmed.
Based on, and how far it reachesIBC Appendix G, 2018 edition.Applies across the territory, and local governments enforce it as written.
Adopted byDepartment of Public Works, Building Safety Code Division.
Modular and factory-built buildingsPrefabricated buildings (NMIAC § 155-10.1-210)
Applies toWhere parts of a prefabricated building cannot be inspected on site, the Building Safety Official may accept certification from an approved testing agency that the building is identical to a specimen it tested and approved.
Based on, and how far it reachesThe territory's own code (NMIAC § 155-10.1-210).Applies across the territory, and local governments enforce it as written.
Local changesRegulation amendments adopted in the Commonwealth Register on July 28, 2020 (42 Com. Reg. 43713); the exact effective date was not confirmed.
Adopted byDepartment of Public Works, Building Safety Code Division.
Existing buildingsExisting buildings: IEBC within the ICC family of codes (not confirmed)
Applies toNMIAC § 155-10.1-601 adopts the 2018 IBC with 'its ICC Family of codes'; whether DPW applies the 2018 IEBC through that clause was not confirmed.
Based on, and how far it reachesIEBC, 2018 edition.Applies across the territory, and local governments enforce it as written.
Adopted byDepartment of Public Works, Building Safety Code Division.
PlumbingPlumbing: IPC within the ICC family of codes (not confirmed)
Applies toWhether the 'ICC Family of codes' clause of NMIAC § 155-10.1-601 brings in the 2018 IPC was not confirmed; no separate plumbing adoption was found.
Based on, and how far it reachesIPC, 2018 edition.Applies across the territory, and local governments enforce it as written.
Adopted byDepartment of Public Works, Building Safety Code Division.
MechanicalMechanical: IMC within the ICC family of codes (not confirmed)
Applies toWhether the 'ICC Family of codes' clause brings in the 2018 IMC and IFGC was not confirmed.
Based on, and how far it reachesIMC, 2018 edition.Applies across the territory, and local governments enforce it as written.
Adopted byDepartment of Public Works, Building Safety Code Division.
Not adopted here, or not found yet
FireFire code: not confirmedNot found
Applies toNo adoption of the IFC or NFPA 1 by the Commonwealth fire agency was found.
Based on, and how far it reachesIFC.
Not confirmed yet: who adopts it.
ElectricalElectrical code: not confirmedNot found
Applies toNo NEC adoption was found in the Building Safety Code rules.
Based on, and how far it reachesNFPA 70.
Not confirmed yet: who adopts it.
Manufactured homesManufactured home installation: not confirmedNot found
Applies toThe federal HUD Code governs construction of manufactured homes (see the federal page); Commonwealth installation rules or HUD's role were not confirmed.
Based on, and how far it reachesHUD Code (24 CFR 3280, 3285).
Adopted byHUD; Commonwealth agency not confirmed.
Who designs, seals and builds
- Architect
- Permit applications may be filed by the owner, lessee or agent, or by a CNMI-licensed engineer or architect employed on the work (NMIAC § 155-10.1-105). Structural, mechanical and electrical details, computations and other engineering data the Building Safety Official requires must bear the signature of a CNMI-licensed professional engineer or architect responsible for the work (§ 155-10.1-125). Whether a house can be permitted without a licensed designer, and the name of the licensing board, were not confirmed on an official page.NMIAC §§ 155-10.1-105, 155-10.1-125Checked at the source
- Engineer
- Engineering drawings and computations must be signed by a CNMI-licensed professional engineer or architect responsible for the work (NMIAC § 155-10.1-125). The Northern Mariana Islands is an NCEES member jurisdiction.NMIAC § 155-10.1-125Checked at the source
- Contractor
- Contractor and trade licensing in the Commonwealth was not confirmed. This was not confirmed.Not yet checked at the source
Design loads and hazards
- Wind
- Minimum design wind of 175 mph for every building and structure (NMIAC § 155-10.1-615), in addition to the 2018 IBC wind provisions.
- Snow
- None found in the Commonwealth rules.
- Seismic
- Seismic Zone 4 standards are required where earthquake design applies (NMIAC § 155-10.1-615). USGS web services for Saipan: ASCE 7-16 SS 1.79 g and S1 0.45 g (site class D, SDS 1.19 g); ASCE 7-22 SDS 1.5 g and Seismic Design Category D at the default site class.
- Frost depth
- None found in the Commonwealth rules.
- Flood
- IBC Appendix G adopted; finish floor elevations in flood zones must be referenced to a vertical datum on the site plan.
- Other hazards
- Typhoons: the regulation cites recent typhoons and super typhoons as the reason for the 175 mph minimum; DPW cites super typhoons as the reason for moving to the 2018 IBC.
Permits
- Who issues them
- The Department of Public Works Building Safety Code Division (Building Safety Official) reviews plans, issues building permits and inspects all commercial and residential structures in the Commonwealth.
- Review time limits
- The Building Safety Official must promptly examine applications and act without unreasonable or unnecessary delay (NMIAC §§ 155-10.1-130, 155-10.1-135); requests to use new or alternate materials must be decided within a reasonable time not over 90 days (§ 155-10.1-035).
- Private review
- None found; for prefabricated buildings the Building Safety Official may accept an approved testing agency's certification (§ 155-10.1-210).
Where to read the codes, and who to ask
- Public Law 21-14 (International Building Code adopted)
- NMIAC Chapter 155-10.1, Building Safety Code rules and regulations
- Building Safety Code Division (DPW)
- CNMI Law Revision Commission (Commonwealth Code and Register)
- ICC Digital Codes: 2018 IBC and IRC (read free)
- ICC: Northern Mariana Islands adoptions (lists the 2009 IBC; outdated)
- FEMA Building Code Adoption Tracking, Region 9 (2025)
- USGS seismic design web services
- FEMA Flood Map Service Center
- CNMI Department of Public Works, Building Safety Code DivisionBuilding Safety Official: adopts code updates by regulation, plan review, permits, inspections, partial flood enforcement
- Northern Marianas Commonwealth LegislatureEnacts the Building Safety Code and code adoption laws
- CNMI Office of Planning and DevelopmentCommonwealth planning
Not found yet
- Exact effective date of the 2018 IBC: P.L. 21-14 took effect 180 days after approval in December 2019 (the exact approval date is not confirmed); DPW's regulation amendments were adopted July 28, 2020.
- Whether the 'ICC Family of codes' clause covers the IEBC, IPC, IMC, IFGC, IFC and ISPSC was not confirmed; no NEC, fire code or elevator code adoption was found.
- Contractor and trade licensing, and the name and rules of the architect and engineer licensing board, not confirmed.
- Floodplain management rules beyond IBC Appendix G, NFIP status and freeboard not confirmed.
- ICC's adoption page still lists only the 2009 IBC for the Commonwealth; FEMA's 2025 tracking and the Commonwealth's own law and rules show the 2018 IBC and IRC.
- No plan to adopt the 2021 or 2024 IBC was found.