United States (federal rules)
There is no federal building code for private construction: states, territories, counties and cities adopt and enforce building codes, and their pages in this library say which. Federal law reaches buildings anywhere in the country through civil rights accessibility rules (ADA, Fair Housing Act, Section 504, Architectural Barriers Act), the HUD manufactured home code (which preempts state codes), flood rules for communities in the National Flood Insurance Program, conditions tied to federal money, permits or land (Section 106, FAA airspace review), worker safety (OSHA) and lead-safe renovation (EPA). Federal agencies build their own buildings to nationally recognized model codes under 40 U.S.C. 3312, and DOE's energy code determinations set what each state must review.
16 codes are in force here, 16 of them checked at the source, and this page was last updated November 19, 2026.
Codes in force
Accessibility2010 ADA Standards for Accessible Design (28 CFR 35.151 and 28 CFR part 36, subpart D)March 15, 2012
Applies toNationwide. New construction and alterations of state and local government facilities (ADA Title II) and of public accommodations and commercial facilities (Title III): offices, shops, restaurants, hotels, schools, hospitals, stadiums, transit facilities, any size. It covers fixed or built-in elements, site improvements and pedestrian routes. The part of a private residence used only as a home is not covered; housing at places of education follows the transient lodging or residential rules, and group homes and shelters follow the residential facility rules. Existing facilities are reached through Title III barrier removal and Title II program access. State and local codes may require more.
Based on, and how far it reaches2010 ADA Standards for Accessible Design (2004 ADAAG, 36 CFR part 1191 appendices B and D), 2010 edition.A national minimum that states and cities may add to.
NotesPublished September 15, 2010. Where 28 CFR 35.151 or part 36 subpart D differ from the 2004 ADAAG, the DOJ rules govern. For Title III the date that decides which standard applies is the date the last building permit application is certified complete.
Adopted byU.S. Department of Justice, Civil Rights Division (enforcement); U.S. Access Board (guidelines).In force since March 15, 2012.
AccessibilityArchitectural Barriers Act Accessibility Standards (ABAAS)
Applies toFacilities designed, built, altered or leased with federal funds: federal buildings such as post offices, courthouses, national park facilities and military facilities, and non-federal facilities such as public housing and mass transit built or altered with federal grants or loans. GSA, DoD and USPS use the ABA Standards; HUD has not adopted this edition and still applies the Uniform Federal Accessibility Standards (UFAS) to residential facilities under its jurisdiction.
Based on, and how far it reachesABA Accessibility Standards (36 CFR part 1191, appendices C and D); UFAS for HUD, 2004 ABA guidelines.Applies to some buildings only, such as federal buildings and federally funded projects.
NotesAdoption dates by standard-setting agency (U.S. Access Board): USPS May 17, 2005; GSA November 8, 2005; DoD October 31, 2008 (policy memorandum). The agencies jointly adopted UFAS on August 7, 1984. GSA also adopted the public right-of-way guidelines (PROWAG, 36 CFR part 1190) on July 3, 2024, and its 2026 Core Building Standards list both.
Adopted byU.S. Access Board (guidelines, enforcement); standard-setting agencies GSA, DoD, HUD and USPS.
AccessibilityFair Housing Act design and construction requirements (42 U.S.C. 3604(f)(3)(C); 24 CFR 100.205)March 13, 1991
Applies toNationwide, public or private, with or without federal money. Covered multifamily dwellings for first occupancy after March 13, 1991: every unit in buildings of 4 or more units that have an elevator, and ground-floor units in other buildings of 4 or more units. Seven requirements: a building entrance on an accessible route (unless the terrain makes it impractical), accessible public and common use areas, doors wide enough for wheelchairs, an accessible route into and through each unit, reachable switches, outlets and thermostats, bathroom wall reinforcement for grab bars, and usable kitchens and bathrooms. Single-family homes and buildings of 3 or fewer units are not covered.
Based on, and how far it reachesFair Housing Act design and construction requirements; HUD safe harbors (ICC A117.1, IBC), Safe harbors through the 2018 IBC and ICC A117.1-2009.A national minimum that states and cities may add to.
NotesCompliance with ICC A117.1-2009, ICC/ANSI A117.1-2003 or -1998, CABO/ANSI A117.1-1992 or ANSI A117.1-1986 meets the unit requirements. HUD safe harbors also include the Fair Housing Accessibility Guidelines (1991), the Fair Housing Act Design Manual, the 2000 ICC CRHA and the 2000 (with 2001 supplement), 2003, 2006, 2009, 2012, 2015 and 2018 IBC, conditions apply; the 2009 to 2018 IBC and ICC A117.1-2009 were added by a final rule of December 8, 2020, effective March 8, 2021. A state or local law that includes these requirements satisfies them, but local plan approval is not conclusive in an enforcement case, and state laws may require more access.
Adopted byHUD Office of Fair Housing and Equal Opportunity; U.S. Department of Justice.In force since March 13, 1991.
AccessibilitySection 504 of the Rehabilitation Act (29 U.S.C. 794): HUD rules at 24 CFR part 8July 11, 1988
Applies toBuildings built or altered by or for recipients of federal financial assistance; each funding agency has its own rule. HUD: new multifamily housing projects must be accessible, with at least 5 percent of units (at least one) accessible for people with mobility impairments and another 2 percent (at least one) for people with hearing or vision impairments (24 CFR 8.22); UFAS is the deemed-to-comply standard (24 CFR 8.32), and since May 23, 2014 HUD recipients may use the 2010 ADA Standards with HUD's listed exceptions. HHS: construction starting on or after May 9, 2025 by public-entity recipients must meet the 2010 ADA Standards (45 CFR 84.23).
Based on, and how far it reachesSection 504 agency rules: UFAS (HUD); 2010 ADA Standards (HHS, and as a HUD alternative), (HUD 24 CFR 8.32); 2010 ADA Standards.Applies to some buildings only, such as federal buildings and federally funded projects.
NotesHUD's UFAS rule applies to facilities designed, built or altered after July 11, 1988 (the date bids are solicited counts). HUD notice of May 23, 2014 (79 FR 29671) allows the 2010 ADA Standards as an alternative until HUD revises its rule.
NextUpdated HUD Section 504 rule. HUD proposed updates to its Section 504 rule on April 25, 2023 (88 FR 24938); no final rule was found in the Federal Register.
Adopted byEach federal funding agency (HUD for housing, HHS for health and human services recipients).In force since July 11, 1988.
Manufactured homesManufactured Home Construction and Safety Standards, 24 CFR part 3280September 15, 2025
Applies toEvery manufactured home built for sale in the United States and its territories: design, construction, transportation, fire safety, plumbing, heating and electrical systems. One national code that preempts state and local construction rules for these homes. Wind Zones I to III (Zone II 100 mph, Zone III 110 mph, based on ANSI/ASCE 7-88), roof load zones and thermal zones are shown on the home's data plate; electrical work references NFPA 70, 2014 edition. Modular homes are not covered; they follow state and local codes.
Based on, and how far it reachesHUD Manufactured Home Construction and Safety Standards (HUD Code), 24 CFR part 3280 as amended through the fourth and fifth sets of updates (effective September 15, 2025).Applies nationwide as written.
NotesHUD's final rule of September 16, 2024 (89 FR 75704) adopted most of the fourth and fifth sets of Manufactured Housing Consensus Committee recommendations; its effective date was moved from March 17, 2025 to September 15, 2025 (90 FR 10593). The 21st Century ROAD to Housing Act (Public Law 119-101, July 11, 2026, section 301) changed the federal definition to homes built with or without a permanent chassis and directs HUD to set standards, a distinct label, data plate and invoice notation for chassis-less homes.
NextStandards for chassis-less homes and HUD energy standards, expected July 11, 2027. HUD proposed on June 12, 2026 that a transportable section serving as part of an upper floor need not be built on a permanent chassis (91 FR 35632). The ROAD Act requires HUD to adopt minimum energy efficiency standards for manufactured homes within one year of enactment (by July 11, 2027) and update them every 3 years; DOE says its 2022 manufactured housing energy standards have no legal effect (91 FR 59048, September 18, 2026). States must certify within one year (two years where the legislature meets every other year) that their laws treat chassis-less homes the same as other manufactured homes.
Adopted byHUD Office of Manufactured Housing Programs; state administrative agencies; design approval (DAPIA) and production inspection agencies.In force since September 15, 2025.
- 24 CFR part 3280 (eCFR)
- Manufactured Home Construction and Safety Standards, final rule, 89 FR 75704 (September 16, 2024)
- Postponing effective date, 90 FR 10593 (February 25, 2025)
- Proposed rule: Revising the Definition of Manufactured Home, 91 FR 35632 (June 12, 2026)
- 21st Century ROAD to Housing Act, Public Law 119-101 (July 11, 2026)
- DOE notification on manufactured housing energy standards, 91 FR 59048 (September 18, 2026)
Manufactured homesModel Manufactured Home Installation Standards (24 CFR 3285) and Manufactured Home Installation Program (24 CFR 3286)October 20, 2008
Applies toInitial installation of new manufactured homes: support, anchoring, foundations and the close-up work that joins sections of a multi-section home. States may run their own installation program if it protects residents at least as well; in states without one, HUD administers the program and the federal standards are the minimum. The manufacturer's installation instructions must meet or exceed these standards.
Based on, and how far it reachesHUD Model Manufactured Home Installation Standards and Installation Program (24 CFR parts 3285 and 3286).A national minimum that states and cities may add to.
NotesPart 3286 took effect October 20, 2008 with a phased schedule. Parts 3285 and 3286 were amended with the 2024 construction standards rule (effective September 15, 2025).
NextChassis-less home definition. HUD's June 12, 2026 proposal would also change the definition in parts 3285 and 3286; under the ROAD Act a state that does not certify parity for chassis-less homes must prohibit their manufacture, installation or sale.
Adopted byHUD Office of Manufactured Housing Programs; states with qualifying installation programs.In force since October 20, 2008.
Flood rules beyond the federal minimumNational Flood Insurance Program floodplain management regulations (44 CFR 60.3)October 26, 1976
Applies toCommunities that join the NFIP (so that flood insurance is sold there) must adopt and enforce these minimum rules for new construction and substantial improvements in mapped special flood hazard areas. A zones: lowest floor, including basement, of homes at or above the base flood elevation (BFE); nonresidential buildings may be dry floodproofed instead; enclosed areas below the lowest floor limited to parking, access and storage with flood openings (at least 1 square inch per square foot of enclosed area, two openings minimum); AO zones elevated by the depth number (2 feet if none). V zones: buildings on piles or columns with the bottom of the lowest horizontal structural member at or above BFE, design certified by a registered engineer or architect, open space below or breakaway walls of 10 to 20 psf. Floodways: no rise in flood levels. The federal minimum has no freeboard; many states, the I-codes and ASCE 24 require more (see each state's page).
Based on, and how far it reachesNFIP floodplain management criteria (44 CFR 60.3).A national minimum that states and cities may add to.
Adopted byFEMA (Federal Insurance and Mitigation Administration); enforced by participating communities.In force since October 26, 1976.
Flood rules beyond the federal minimumFederal Flood Risk Management Standard (FFRMS): current status
Applies toOnly federally funded or federal actions in floodplains, not private construction without federal money. The FFRMS widened the floodplain and raised the flood elevation used for those actions. HUD's version (April 23, 2024 rule) preferred a climate-informed science approach and required the lowest floor of new FHA-insured and public housing one- to four-unit homes to be built 2 feet above the BFE. EO 13690 (January 30, 2015) was revoked in 2017 (EO 13807), reinstated on May 20, 2021 (EO 14030), and EO 14030 was revoked on January 20, 2025 (EO 14148).
Based on, and how far it reachesFederal Flood Risk Management Standard (Executive Order 11988 as amended by EO 13690), 2015 edition.Applies to some buildings only, such as federal buildings and federally funded projects.
NotesHUD waived its 2-foot elevation rule for insured single-family housing on February 20, 2025 (lowest floor above BFE again) and extended the waiver on February 20, 2026. FEMA's own FFRMS rule (44 CFR part 9, published July 11, 2024, effective September 9, 2024) applies to FEMA-funded actions; no FEMA rescission was found in the Federal Register.
NextHUD rescission of its 2024 FFRMS rule. HUD proposed on July 10, 2026 to rescind most of its April 23, 2024 rule, restoring the earlier floodplain process and putting the waiver into its Minimum Property Standards (comments closed September 8, 2026). No final rule was found.
Adopted byEach federal agency for its own actions (HUD, FEMA, DOT and others).
OtherNotice of proposed construction or alteration (FAA Form 7460-1, 14 CFR part 77): tall buildings, towers and cranes
Applies toAnyone proposing construction or alteration more than 200 feet above ground; anything above an imaginary surface sloping 100 to 1 for 20,000 feet from a public-use or military airport with a runway over 3,200 feet, 50 to 1 for 10,000 feet from airports with shorter runways, or 25 to 1 for 5,000 feet from heliports; construction on such airports; and roads, railroads and waterways adjusted for the vehicles that use them. Temporary construction, equipment and apparatus count, so cranes need notice too. File at least 45 days before construction starts or the construction permit application is filed, whichever is first; structures over 2,000 feet are presumed hazards. FAA issues a determination of hazard or no hazard; it is not a building permit, and local airport zoning may add limits.
Based on, and how far it reachesFAA obstruction evaluation (14 CFR part 77), 2010 rule.Applies nationwide as written.
NotesExemptions include objects shielded by existing structures in a built-up area and antennas of 20 feet or less (unless they raise another antenna structure). Supplemental notice is due within 5 days after the structure reaches its greatest height when the determination requires it.
Adopted byFederal Aviation Administration, Obstruction Evaluation / Airport Airspace Analysis (OE/AAA).
OtherSection 106 review of federal undertakings (36 CFR part 800)
Applies toAny project carried out, funded, permitted, licensed or approved by a federal agency (an undertaking). Before approving funds or issuing the license, the agency must identify historic properties, assess effects and consult with the State or Tribal Historic Preservation Officer and others, seeking to avoid, minimize or mitigate adverse effects. Relevant to historic buildings, monuments and memorials, and to private projects that need federal money or a federal permit (HUD funding, Army Corps permits, FCC-licensed towers). Projects with no federal involvement are not covered; local landmark laws may still apply.
Based on, and how far it reachesNational Historic Preservation Act section 106 (54 U.S.C. 306108), 36 CFR part 800 (as amended 2004).Applies to some buildings only, such as federal buildings and federally funded projects.
NotesACHP program comments streamline some reviews, including the Program Comment on Certain Housing, Building, and Transportation Undertakings (effective December 20, 2024; notice published April 2, 2025).
NextACHP guidance for housing. Executive Order 14394 (March 13, 2026) directs the ACHP chairman to develop guidance that exempts or reduces Section 106 burdens for housing construction and the roads, water and sewer that serve it.
Adopted byAdvisory Council on Historic Preservation; federal agencies; State and Tribal Historic Preservation Officers.
OtherSafety and Health Regulations for Construction (29 CFR part 1926)
Applies toEmployers doing construction, alteration and repair work, including painting and decorating: fall protection, scaffolds, excavations, cranes and derricks, silica and other hazards. This is a worker safety rule, not a building code. Federal OSHA enforces it in most states; 29 OSHA-approved State Plans enforce their own rules, which must be at least as effective: 22 cover private and public workers (including Puerto Rico) and 7 cover only state and local government workers (including the U.S. Virgin Islands).
Based on, and how far it reachesOSHA construction standards (29 CFR part 1926).A national minimum that states and cities may add to.
Adopted byOccupational Safety and Health Administration (U.S. Department of Labor); OSHA-approved State Plans.
OtherLead Renovation, Repair and Painting (RRP) RuleApril 22, 2010
Applies toRenovation done for pay that disturbs paint in housing and child-occupied facilities (day care centers, preschools, kindergartens) built before 1978. Firms must be certified, work must be directed by a certified renovator, and lead-safe work practices are required. Exceptions: components shown to be lead-free by a certified inspector, an EPA-recognized test kit or lab test, and minor repair disturbing 6 square feet or less per room inside or 20 square feet or less outside (no window replacement or demolition). Homeowners working on their own home are generally not covered unless they rent it out, run a child care center there or flip houses. Fifteen states run their own authorized programs: Alabama, Delaware, Georgia, Iowa, Kansas, Massachusetts, Mississippi, North Carolina, Oklahoma, Oregon, Rhode Island, Utah, Vermont, Washington and Wisconsin, plus the Minnesota Chippewa Tribe (Bois Forte).
Based on, and how far it reachesEPA Lead Renovation, Repair and Painting Rule (40 CFR part 745, subpart E).A national minimum that states and cities may add to.
NotesEPA lowered the dust-lead hazard standards and post-abatement clearance levels (final rule November 12, 2024, effective January 13, 2025); this mainly affects abatement and lead evaluations.
Adopted byU.S. Environmental Protection Agency; EPA-authorized states and tribes.In force since April 22, 2010.
Energy, housesMinimum energy standards for new HUD- and USDA-financed housing (EISA 2007 section 481, 42 U.S.C. 12709)May 1, 2026
Applies toNew construction in programs covered by EISA: FHA single-family and multifamily mortgage insurance, the Public Housing Capital Fund, HOPE VI, Choice Neighborhoods, Project-Based Vouchers, Section 202 and 811, Rental Assistance Demonstration, USDA Section 502 guaranteed and direct loans and Section 523, and HOME and Housing Trust Fund projects. The IECC applies to single-family homes and multifamily buildings up to 3 stories, ASHRAE 90.1 to multifamily buildings of 4 or more stories. After the 2024 determination was rescinded, covered programs follow the standards in effect before April 26, 2024 (the 2009 IECC and ASHRAE 90.1-2007).
Based on, and how far it reachesIECC and ASHRAE 90.1 (2009 IECC; ASHRAE 90.1-2007).Applies to some buildings only, such as federal buildings and federally funded projects.
NotesThe April 26, 2024 determination adopting the 2021 IECC and ASHRAE 90.1-2019 had its compliance dates extended several times, was set aside by a federal court on March 5, 2026 (State of Utah v. HUD, E.D. Texas) and was rescinded by HUD and USDA effective May 1, 2026.
NextNone scheduled. Executive Order 14394 directs HUD and USDA to review and revise these standards; no new determination was found.
Adopted byHUD Office of Environment and Energy; USDA Rural Housing Service.In force since May 1, 2026.
Energy, other buildingsEnergy efficiency standard for new federal commercial and high-rise multifamily buildings (10 CFR 433.100)April 7, 2023
Applies toNew federal buildings that are commercial or multifamily high-rise residential buildings, with design for construction starting on or after April 7, 2023: meet ASHRAE 90.1-2019 and, if life-cycle cost-effective, use at least 30 percent less energy than the 90.1-2019 baseline.
Based on, and how far it reachesASHRAE 90.1, 2019 edition.Applies to some buildings only, such as federal buildings and federally funded projects.
NotesDOE's 2024 Clean Energy Rule (fossil fuel-generated energy limits, 10 CFR part 433 subpart B) is stayed: on September 2, 2026 DOE stayed its compliance date until March 1, 2027 under a rulemaking titled Repeal of Fossil Fuel Restrictions for New Federal Buildings.
NextRepeal of the fossil fuel rule, expected March 1, 2027. Compliance with subpart B is stayed until March 1, 2027 while DOE reviews it.
Adopted byDOE Federal Energy Management Program; each federal agency.In force since April 7, 2023.
Energy, housesEnergy efficiency standard for new federal low-rise residential buildings (10 CFR 435.4)April 5, 2023
Applies toNew federal low-rise residential buildings (military and other federal housing) with design for construction starting on or after April 5, 2023: meet the 2021 IECC and, if life-cycle cost-effective, use at least 30 percent less energy than the 2021 IECC baseline.
Based on, and how far it reachesIECC, 2021 edition.Applies to some buildings only, such as federal buildings and federally funded projects.
NotesThe fossil fuel rule in 10 CFR part 435 subpart B is stayed until March 1, 2027 (91 FR 56371).
Adopted byDOE Federal Energy Management Program; each federal agency.In force since April 5, 2023.
BuildingFederal buildings: 40 U.S.C. 3312 and the GSA 2026 PBS Core Building Standards (which replaced the P100 Facilities Standards)October 1, 2026
Applies toBuildings constructed or altered by GSA or any other federal agency must comply, to the maximum extent feasible, with a nationally recognized model building code and other national codes, in their latest editions (40 U.S.C. 3312). Federal projects are not subject to local building permits, but the agency must consider local zoning, setback, height and historic preservation rules, consult local officials, submit plans for review on request (up to 30 days) and allow local inspections. GSA's 2026 Core Building Standards apply to PBS projects awarded on or after October 1, 2026 in GSA-owned and lease-construction buildings: IBC, IFC, IPC, IMC, IFGC, IEBC, IPMC, IPSDC, IZC, IWUIC, IRC and ICC Performance Code (not the IECC, the IgCC or IBC chapter 13), NFPA 70, NFPA 101 in place of the IBC egress provisions, ASCE 7-22 and ASCE 41-23, ASME A17.1, and the ABA accessibility standards. Designs must carry the seal of a design professional licensed where the project is.
Based on, and how far it reachesIBC and the I-codes, NFPA 70, NFPA 101, ASCE 7-22 (Latest edition in effect on the solicitation date).Applies to some buildings only, such as federal buildings and federally funded projects.
NotesThe Core Building Standards replaced the P100 (last edition 2024); GSA let projects that had reached 50 percent construction by January 21, 2025 continue under P100. The February 2025 Interim Core Building Standards were replaced by the 2026 edition (memorandum of September 21, 2026). New federal buildings in the wildland-urban interface at moderate or greater wildfire risk (and alterations over 5,000 square feet) apply the current IWUIC; new buildings follow the latest IBC earthquake provisions and existing ones the ICSSC standards (EO 13717).
Adopted byGSA Public Buildings Service, Office of Architecture and Engineering; other federal agencies under 40 U.S.C. 3312.In force since October 1, 2026.
- 40 U.S.C. 3312 Compliance with nationally recognized codes (govinfo)
- Core Building Standards for the Public Buildings Service (GSA)
- 2026 PBS Core Building Standards memorandum and Appendix A (September 21, 2026)
- PBS Interim Core Building Standards training (April 30, 2025): the Core Building Standards replace P100
Not adopted here, or not found yet
Energy, housesDOE determination on the 2024 IECC (Energy Conservation and Production Act section 304, 42 U.S.C. 6833)No code of this kind is adopted
Applies toNo federal energy code applies to private homes; states and localities adopt them. DOE's affirmative determination that the 2024 IECC improves residential energy efficiency (Federal Register December 30, 2024) requires each state to certify, by December 30, 2026, that it has reviewed its residential energy code and decided, in writing and after public notice and hearing, whether to update it to meet or exceed the 2024 IECC. A state that decides not to must give DOE its reasons.
Based on, and how far it reachesIECC, 2024 edition.
NextA newer IECC edition. State certifications for the 2024 IECC are due December 30, 2026. Executive Order 14394 (March 13, 2026) directs DOE to review and revise residential building energy codes subject to its review. The next IECC edition will need its own determination.
Adopted byU.S. Department of Energy, Building Energy Codes Program.
Energy, other buildingsDOE determination on ANSI/ASHRAE/IES Standard 90.1-2022 (42 U.S.C. 6833)No code of this kind is adopted
Applies toNo federal energy code applies to private commercial buildings. After DOE's affirmative determination for Standard 90.1-2022 (Federal Register March 6, 2024), each state had to certify by March 6, 2026 that it has reviewed and updated its commercial energy code to meet or exceed Standard 90.1-2022. Unlike the residential review, the commercial update is required.
Based on, and how far it reachesASHRAE 90.1, 2022 edition.
NextA newer Standard 90.1 edition. No DOE determination on a newer Standard 90.1 edition was found in the Federal Register.
Adopted byU.S. Department of Energy, Building Energy Codes Program.
BuildingSingle-stair (point-access block) residential buildings: HUD guidelines under the ROAD to Housing Act, section 102No code of this kind is adopted
Applies toNo federal rule yet, and none will preempt state or local codes. HUD must issue guidelines within 18 months of July 11, 2026 giving states, territories, tribes and localities model code language, best practices and technical guidance for permitting Group R-2 residential buildings up to 6 stories where a single interior stair serves every unit, covering sprinklers, smoke detection, ventilation and egress. HUD must coordinate with the ICC to encourage provisions in the IBC and may fund pilot projects for 7 years.
Based on, and how far it reachesHUD guidelines (model code language) for point-access block buildings.
NextHUD point-access block guidelines, expected January 11, 2028. Statutory deadline: 18 months after enactment on July 11, 2026.
Adopted byHUD.
Modular and factory-built buildingsModular homes: no federal codeNo code of this kind is adopted
Applies toThere is no federal modular code. Federal law defines a modular home as one built in a factory in modules that each meet the state and local building codes where the home will be placed, then set on a foundation and completed on site (ROAD to Housing Act section 302). States run modular and factory-built programs (see each state's page). The Act directs HUD to review FHA construction financing barriers to modular methods and report within one year, then start a rulemaking on draw schedules.
Based on, and how far it reachesState and local building codes.
NextHUD report on FHA construction financing for modular homes, expected July 11, 2027. Report due one year after enactment; rulemaking to start within 120 days of the report.
Adopted byHUD (FHA programs); states for modular codes.
Who designs, seals and builds
- Architect
- There is no federal license. Each state, the District of Columbia and each territory licenses architects and decides when one is required, including any house or small-building exemption (see each state's page). NCARB, the council of the licensing boards, runs the Architect Registration Examination, the Architectural Experience Program and the NCARB Certificate used for licensing in other jurisdictions. For federal work, GSA requires designs to be developed under the direction of, and sealed by, a design professional licensed in the state, district or territory where the project is.40 U.S.C. 3312 (federal buildings); GSA 2026 PBS Core Building StandardsChecked at the source
- Engineer
- There is no federal license; engineers are licensed by each jurisdiction. NCEES, whose member boards come from all 50 states, the District of Columbia, Guam, the Northern Mariana Islands, Puerto Rico and the U.S. Virgin Islands, writes the FE and PE exams used everywhere and keeps records for licensing in more than one place. Federal rules that call for an engineer or architect: the NFIP requires a registered professional engineer or architect to develop or review and certify V-zone foundation designs and breakaway walls over 20 psf (44 CFR 60.3(e)), and engineered flood openings may be certified instead of the prescriptive rule (60.3(c)(5)); GSA requires a licensed design professional's seal on federal building designs.44 CFR 60.3(c)(5) and (e)(4) to (5)Checked at the source
- Contractor
- There is no federal contractor license; states, territories and localities license general contractors and trades. Federal certifications that apply to builders: EPA (or an authorized state) certifies renovation firms and renovators working on pre-1978 housing and child-occupied facilities (40 CFR part 745), and in states without their own manufactured home installation program HUD runs the installation program, including installer certification of each installation (24 CFR part 3286).40 CFR 745.81; 24 CFR part 3286Checked at the source
Design loads and hazards
- Wind
- ASCE/SEI 7 sets the national wind maps that the IBC and IRC reference; the current edition is ASCE 7-22 with Supplements 1 to 3, with values available through the ASCE Hazard Tool (the ATC Hazards by Location tool also gives values). ASCE 7-22 added a tornado load chapter that defends against tornadic winds up to about 135 mph. Manufactured homes use the HUD wind zones instead: Zone I, Zone II (100 mph) and Zone III (110 mph), based on ANSI/ASCE 7-88 and listed by county in 24 CFR 3280.305.
- Snow
- Ground snow loads come from ASCE 7 through the ASCE Hazard Tool; some states publish their own snow load studies (see each state's page). Manufactured homes are built to the HUD roof load zones shown on the data plate (24 CFR 3280.305).
- Seismic
- The USGS seismic design web services return ASCE 7-16 and ASCE 7-22 design values and the Seismic Design Category for any latitude and longitude, risk category and site class. New federal buildings follow the earthquake provisions of the latest IBC and existing federal buildings the ICSSC standards (EO 13717, GSA Core Building Standards).
- Frost depth
- No federal frost depth rule; states and localities set it.
- Flood
- NFIP minimum (44 CFR 60.3): lowest floor at or above the base flood elevation in A zones, pile or column foundations with the lowest horizontal member at or above it in V zones, flood openings for enclosures, no floodway rise; no freeboard in the federal minimum. Flood maps: FEMA Flood Map Service Center and National Flood Hazard Layer. The Federal Flood Risk Management Standard applies only to federally funded actions and is being withdrawn by HUD (proposal of July 10, 2026). ASCE 7-22 Supplement added provisions for the 500-year flood.
- Other hazards
- Rainfall: NOAA Atlas 14 precipitation frequency estimates through the Precipitation Frequency Data Server (states, Puerto Rico, the U.S. Virgin Islands and selected Pacific islands). Tsunami design zones: ASCE 7 Tsunami Geodatabase. Tall structures and cranes near airports: FAA Part 77. FEMA tracks hazard-resistant code adoption (2021 or later IBC and IRC) by state and territory each year (Building Code Adoption Tracking).
Permits
- Who issues them
- No federal building permit exists for private construction: states, territories, counties and cities issue permits. Federal agencies building their own projects do not take out local permits but consult local officials and allow inspections (40 U.S.C. 3312). Federal approvals that run alongside local permits include FAA airspace determinations for tall structures and cranes (14 CFR part 77), Section 106 consultation for federally funded or licensed projects, Clean Water Act section 404 permits from the Army Corps of Engineers for fill in waters and wetlands, and HUD certification labels on manufactured homes.
- Review time limits
- No federal clock applies to local plan review. Federal timing rules: FAA notice at least 45 days before construction or the permit application (14 CFR 77.7); local review of federal agency plans on request is limited to a reasonable period not over 30 days (40 U.S.C. 3312(d)). Executive Order 14394 (March 13, 2026) directed HUD to publish within 60 days best practices for state and local governments, including capping permit timelines and fees, by-right single-family homes, limiting retroactive application of new codes and allowing third-party inspections.
- Private review
- Set by each state. EO 14394's best practices encourage third-party inspections and builder choice of certified inspection entities. Manufactured home designs are approved by HUD-accepted design approval primary inspection agencies (DAPIAs), state agencies or private firms (24 CFR 3286.3).
Where to read the codes, and who to ask
- ICC Digital Codes: read the International Codes (basic view free; Premium paid)
- NFPA free access to codes and standards (NFPA 70, NFPA 101, NFPA 1, NFPA 13 and others, read-only)
- ASCE 7-22 Minimum Design Loads (standard is sold)paid
- ASCE Hazard Tool (wind, snow, ice, rain, seismic, flood, tornado data by site)
- USGS seismic design web services (ASCE 7-16, ASCE 7-22, IBC and other references)
- ATC Hazards by Location (wind, seismic, snow by address)
- FEMA Flood Map Service Center (FIRMs and Flood Insurance Studies)
- FEMA National Flood Hazard Layer
- NOAA Atlas 14 Precipitation Frequency Data Server
- DOE energy code state portal (adoption status by state)
- DOE energy code determinations
- UpCodes (codes by jurisdiction with local amendments; free to read, paid features)
- Electronic Code of Federal Regulations (24 CFR 100, 3280, 3285; 44 CFR 60; 14 CFR 77; 36 CFR 800; 29 CFR 1926; 40 CFR 745)
- 2010 ADA Standards for Accessible Design
- ABA Accessibility Standards (U.S. Access Board)
- FAA OE/AAA filing portal and Notice Criteria Tool (Form 7460-1)
- ACHP Section 106 guidance
- OSHA construction industry page
- GSA Core Building Standards for federal buildings (2026 edition and archived P100)
- 21st Century ROAD to Housing Act, Public Law 119-101
- FEMA Building Code Adoption Tracking, Region 2 report (Puerto Rico, U.S. Virgin Islands)
- FEMA Building Code Adoption Tracking, Region 9 report (Guam, Northern Mariana Islands, American Samoa)
- ICC international code adoptions
- NFPA NEC enforcement maps
- IAPMO (Uniform Plumbing Code and Uniform Mechanical Code)
- U.S. Department of Justice, Civil Rights Division (ADA)Writes and enforces the ADA Standards for state and local government facilities and public accommodations
- U.S. Access BoardWrites the ADA and ABA accessibility guidelines and enforces the ABA
- HUD Office of Fair Housing and Equal OpportunityEnforces the Fair Housing Act design and construction rules and HUD's Section 504 rules
- HUD Office of Manufactured Housing ProgramsWrites and enforces the HUD Code and runs the federal installation program
- FEMA (Federal Insurance and Mitigation Administration)Runs the NFIP, flood maps and building code adoption tracking
- DOE Building Energy Codes ProgramIssues energy code determinations and tracks state adoption and certifications
- GSA Public Buildings Service, Office of Architecture and EngineeringSets the Core Building Standards for federal buildings
- FAA Obstruction Evaluation / Airport Airspace AnalysisReviews notices of proposed construction under 14 CFR part 77
- Advisory Council on Historic PreservationOversees Section 106 review
- Occupational Safety and Health AdministrationConstruction worker safety standards (29 CFR part 1926)
- U.S. Environmental Protection Agency, lead programLead Renovation, Repair and Painting Rule
- NCARB (National Council of Architectural Registration Boards)Council of architect licensing boards: exam, experience program, certificate for licensing in other jurisdictions
- NCEES (National Council of Examiners for Engineering and Surveying)Council of engineering and surveying licensing boards: FE and PE exams, records
Not found yet
- DoD Unified Facilities Criteria, including UFC 1-200-01 (DoD Building Code): edition and adopted model codes not confirmed, so it is not listed as an adoption.
- FEMA's current FFRMS practice: no Federal Register rescission of FEMA's July 2024 rule was found, and whether FEMA still applies its FFRMS policy was not confirmed. DOT, HHS and other agencies' FFRMS procedures are not confirmed.
- On November 19, 2026 the FAA OE/AAA portal home page showed a notice that, because of a government shutdown, FAA could not accept new Part 77 notices. Whether that notice is current or left over from the 2025 shutdown was not confirmed on an official page.
- The date of the 2015 HUD-USDA determination that set the 2009 IECC and ASHRAE 90.1-2007 was not confirmed; the editions come from the 2024 determination and the 2026 rescission notice.
- NCARB's member count (reported as 55 jurisdictions, including Guam, the Northern Mariana Islands, Puerto Rico and the U.S. Virgin Islands) was not confirmed on ncarb.org.
- Which ASCE 7-22 risk categories the tornado chapter applies to, and the ICC 500 storm shelter triggers in the IBC, were not confirmed on an official page.
- Commemorative Works Act and National Park Service rules for monuments on federal land, and Army Corps section 404 thresholds, were not confirmed.
- Section 504 construction standards of agencies other than HUD and HHS (DOT, Education and others) are not confirmed.
- HUD's April 23, 2024 FFRMS rule effective date was not confirmed.