Washington
Washington's State Building Code (chapter 19.27 RCW) applies in every city and county. The State Building Code Council adopts the IBC, IRC, IEBC, IMC with the IFGC, IFC and UPC with state amendments in Title 51 WAC, plus the state-written Washington State Energy Code; local governments enforce it, and some (Seattle, for example) adopt their own versions with local amendments. The 2021 editions took effect March 15, 2024; the 2024 editions are in final adoption with implementation targeted for May 3, 2027. The Department of Labor and Industries runs the electrical (NEC), elevator, boiler and factory-assembled structure programs and registers contractors.
22 codes are in force here, 15 of them checked at the source, and this page was last updated November 19, 2026.
Codes in force
Building2021 International Building Code with Washington amendments (chapter 51-50 WAC)March 15, 2024
Applies toAll buildings other than those under the IRC: commercial, multifamily, institutional, high-rise. Appendix E is adopted.
Based on, and how far it reachesIBC, 2021 edition.A minimum across the state that local governments may add to.
Local changesState amendments throughout chapter 51-50 WAC, including barrier-free accessibility (51-50-005 and Chapter 11), swimming pools (51-50-3109) and other sections; the IMC governs liquefied petroleum gas through NFPA 58 and NFPA 54.
NextThe 2024 edition IBC, expected May 3, 2027. The Council's revised schedule (July 1, 2026) set final adoption for August 28, 2026 and implementation for May 3, 2027; the Council's cycle page still lists the adopted rule (CR-103) date as to be determined.
Adopted byState Building Code Council (Department of Enterprise Services); city and county building departments enforce.In force since March 15, 2024.
Houses2021 International Residential Code with Washington amendments (chapter 51-51 WAC)March 15, 2024
Applies toOne- and two-family dwellings and townhouses up to three stories. IRC Chapter 11 (energy) and Chapters 25 to 43 (plumbing and electrical) are not adopted: energy follows chapter 51-11R WAC, plumbing chapter 51-56 WAC, and electrical chapter 296-46B WAC or a local electrical code.
Based on, and how far it reachesIRC, 2021 edition.A minimum across the state that local governments may add to.
Local changesAppendix AF (radon control methods), Appendix AQ (tiny homes) and Appendix AWU (dwelling unit fire sprinkler systems) are included in the adoption. Section R313.2 (sprinklers in one- and two-family dwellings) is not adopted; townhouse sprinklers are required with exceptions (see the sprinkler entry).
NextThe 2024 edition IRC, expected May 3, 2027. Hearings held June 10 to 12, 2026; implementation targeted for May 3, 2027.
Adopted byState Building Code Council; local building departments enforce.In force since March 15, 2024.
Existing buildings2021 International Existing Building Code with Washington amendments (WAC 51-50-480000 and following)March 15, 2024
Applies toRepair, alteration, change of occupancy, addition and relocation of existing buildings other than IRC houses.
Based on, and how far it reachesIEBC, 2021 edition.A minimum across the state that local governments may add to.
Local changesState amendments include Section 306 (accessibility for existing buildings).
NextThe 2024 edition IEBC, expected May 3, 2027. Adopted with the IBC in Group 1 of the 2024 cycle.
Adopted byState Building Code Council; local building departments enforce.In force since March 15, 2024.
Energy, houses2021 Washington State Energy Code, Residential (chapter 51-11R WAC)March 15, 2024
Applies toEnergy efficiency of new homes, additions and alterations covered by the residential provisions. DOE rates it as equivalent to the 2024 IECC, with state amendments about 25 percent more efficient than the model code adopted.
Based on, and how far it reachesThe state's own code, 2021.A minimum across the state that local governments may add to.
Local changesA state-written code built on the IECC. On October 30, 2026 the Council adopted an emergency rule amending Section R101.2 to give energy code flexibility to owners rebuilding after the 2026 wildfire season; it was filed November 4, 2026 (WSR 26-23-002) and took effect immediately.
NextThe 2024 edition Washington State Energy Code, Residential, expected May 3, 2027. Proposed rule filed July 1, 2026, hearings August 5 and 7, 2026, final adoption scheduled for September 25, 2026 and implementation for May 3, 2027.
Adopted byState Building Code Council, with the Department of Commerce; local building departments enforce.In force since March 15, 2024.
Energy, other buildings2021 Washington State Energy Code, Commercial (chapter 51-11C WAC)March 15, 2024
Applies toEnergy efficiency of commercial buildings and other buildings covered by the commercial provisions, and their additions and alterations. DOE rates it as equivalent to ASHRAE 90.1-2022, with state amendments about 26 percent more efficient than the model code adopted.
Based on, and how far it reachesThe state's own code, 2021.A minimum across the state that local governments may add to.
Local changesA state-written code built on the IECC and ASHRAE 90.1. The Council held hearings in October 2023 on changes made because of federal EPCA preemption concerns.
NextThe 2024 edition Washington State Energy Code, Commercial, expected May 3, 2027. Final adoption scheduled for September 25, 2026; implementation May 3, 2027.
Adopted byState Building Code Council; local building departments enforce.In force since March 15, 2024.
Fire2021 International Fire Code with Washington amendments (chapter 51-54A WAC)March 15, 2024
Applies toFire prevention, fire protection systems and hazardous materials in all buildings and premises.
Based on, and how far it reachesIFC, 2021 edition.A minimum across the state that local governments may add to.
Local changesState amendments in chapter 51-54A WAC; by statute participants in religious ceremonies may carry handheld candles.
NextThe 2024 edition IFC, expected May 3, 2027. Group 1 of the 2024 cycle.
Adopted byState Building Code Council; local fire marshals and building officials enforce.In force since March 15, 2024.
Plumbing2021 Uniform Plumbing Code with Washington amendments (chapter 51-56 WAC)March 15, 2024
Applies toPlumbing in all buildings. Appendices A, B, I and M are adopted. UPC Chapters 12 (fuel gas) and 14 are not adopted, and neither are the parts on building sewers or on venting and combustion air for fuel-fired appliances.
Based on, and how far it reachesUPC, 2021 edition.A minimum across the state that local governments may add to.
Local changesState amendments in chapter 51-56 WAC; state rules on certification of plumbers apply.
NextThe 2024 edition UPC, expected May 3, 2027. Proposed rule filed May 5, 2026; implementation targeted for May 3, 2027.
Adopted byState Building Code Council; local building or health departments enforce.In force since March 15, 2024.
Mechanical2021 International Mechanical Code with Washington amendments (chapter 51-52 WAC)March 15, 2024
Applies toMechanical systems, ventilation, exhaust, hydronic piping, boilers and water heaters as mechanical equipment, in all buildings other than IRC houses (IRC mechanical chapters apply to those).
Based on, and how far it reachesIMC, 2021 edition.A minimum across the state that local governments may add to.
Local changesLiquefied petroleum gas installations follow NFPA 58 and NFPA 54 instead of the IMC's own standards (RCW 19.27.031); state amendments to ventilation, kitchen exhaust, ducts and other chapters.
NextThe 2024 edition IMC, expected May 3, 2027. Group 1 of the 2024 cycle, with the IFGC.
Adopted byState Building Code Council; local building departments enforce.In force since March 15, 2024.
Fuel gasInternational Fuel Gas Code adopted through chapter 51-52 WAC (51-52-21000 and following)March 15, 2024
Applies toFuel gas piping, appliances and venting in buildings other than IRC houses; the UPC's fuel gas chapter is not adopted. LP gas follows NFPA 58 and NFPA 54.
Based on, and how far it reachesIFGC, 2021 edition.A minimum across the state that local governments may add to.
Local changesState amendments to IFGC Sections 101, 116 (stop work orders) and 409 (shutoff valves).
NextThe 2024 edition IFGC, expected May 3, 2027. Adopted with the IMC in the 2024 cycle.
Adopted byState Building Code Council; local building departments enforce.In force since March 15, 2024.
ElectricalWashington electrical rules, chapter 296-46B WAC, adopting the 2023 National Electrical CodeApril 1, 2024
Applies toElectrical installations statewide; L&I issues permits and inspects except in cities that run their own electrical inspection programs (Seattle, for example).
Based on, and how far it reachesNFPA 70, 2023 edition.A minimum across the state that local governments may add to.
Local changesWashington amendments in chapter 296-46B WAC, adopted with Annexes A, B and C and later errata and interim amendments.
NextThe 2026 edition NEC, expected December 31, 2026. WAC 296-46B-010 already provides that the 2026 NEC (with Annexes A, B and C) replaces the 2023 edition on December 31, 2026 (WSR 25-23-069).
Adopted byDepartment of Labor and Industries (L&I), Electrical Program; cities with their own electrical programs.In force since April 1, 2024.
AccessibilityBarrier-free accessibility: IBC Chapter 11 with Washington amendments (WAC 51-50-005, 51-50-1110)March 15, 2024
Applies toAccessibility in buildings under the IBC and in existing buildings (IEBC Section 306 amendments); the statute adopts the Council's accessibility rules (RCW 70.92.100 to 70.92.160). The federal ADA applies separately.
Based on, and how far it reachesIBC, 2021 edition.A minimum across the state that local governments may add to.
Local changesState amendments to IBC Chapter 11 and IEBC Section 306.
Adopted byState Building Code Council; local building departments enforce.In force since March 15, 2024.
Elevators and escalatorsElevators and other conveyances, chapter 296-96 WAC (ASME A17.1-2019/CSA B44-19)October 2, 2023
Applies toElevators, dumbwaiters, escalators and moving walks (ASME A17.1-2019/CSA B44-19) and platform lifts and stairway chairlifts (ASME A18.1-2020); the City of Seattle runs its own elevator program.
Based on, and how far it reachesASME A17.1, 2019 edition.Applies across the state, and local governments enforce it as written.
Local changesWashington amendments in chapter 296-96 WAC; the 2016 edition applied from October 1, 2018 to October 1, 2023.
Adopted byDepartment of Labor and Industries, Elevator Program.In force since October 2, 2023.
Pools and spasSwimming pools under IBC Section 3109 with Washington amendments (WAC 51-50-3109)March 15, 2024
Applies toSwimming pools, spas and other water recreation devices regulated through the IBC; the ISPSC is not part of the State Building Code. Public pools are also regulated by the Department of Health (not confirmed).
Based on, and how far it reachesIBC, 2021 edition.A minimum across the state that local governments may add to.
Local changesState amendment to Section 3109.
Adopted byState Building Code Council; local building departments.In force since March 15, 2024.
Green building and stretch codesGreen building codes (local option)
Applies toNo green building code is part of the State Building Code; some cities use green or stretch programs. The state energy code itself is among the most stringent in the country.
Based on, and how far it reachesIgCC; the edition varies by city.Each city or county chooses whether to adopt it, and which edition.
Adopted byCities and counties.
Wildland-urban interfaceWildland Urban Interface Code (chapter 51-55 WAC), placed in reserved status
Applies toUnder SB 6120 and RCW 19.27.560, the state's IWUIC chapter stays reserved until the state completes a statewide wildfire hazard map and a base-level wildfire risk map for each county. Until then cities and counties may adopt the IWUIC in whole or in part and use local hazard maps. When the state maps are done, the State Building Code will include IWUIC Chapter 1 and selected ignition-resistant construction provisions (roofs, exterior walls, decks, driveway access where a first-story wall is more than 150 feet from a fire apparatus road) for permits in high and very high hazard areas, and amendments may not exceed minimum performance standards.
Based on, and how far it reachesIWUIC, 2021 edition.Each city or county chooses whether to adopt it, and which edition.
Local changesThe Council used expedited rulemaking (CR-105 filed October 30, 2025; adopted rule CR-103 March 17, 2026) to put every section of chapter 51-55 WAC into reserved status.
NextIWUIC provisions listed in RCW 19.27.560. Takes effect statewide after the statewide wildfire hazard and risk maps are complete; local maps must then use the same or substantially similar criteria within six months.
Adopted byState Building Code Council; Department of Natural Resources maps; cities and counties.
Property maintenanceProperty maintenance codes (local option)
Applies toNo statewide property maintenance code; cities adopt the IPMC or their own housing codes (Seattle's Housing and Building Maintenance Code and rental inspection program, for example).
Based on, and how far it reachesIPMC; the edition varies by city.Each city or county chooses whether to adopt it, and which edition.
Adopted byCities and counties.
Sprinkler rules for housesIRC Section R313 as amended by WAC 51-51-0313March 15, 2024
Applies toAn automatic residential fire sprinkler system is required in townhouse units (designed to IRC P2904 or NFPA 13D), except for additions or alterations to an existing unsprinklered townhouse and for townhouse buildings with no more than four units. Section R313.2 (one- and two-family dwellings) is not adopted, so detached houses and duplexes need no sprinklers under the state code.
Based on, and how far it reachesIRC, 2021 edition.A minimum across the state that local governments may add to.
Local changesAppendix AWU (dwelling unit fire sprinkler systems) is included in the state's IRC adoption.
Adopted byState Building Code Council; local building and fire officials enforce.In force since March 15, 2024.
Manufactured homesManufactured home installation and alteration permits (L&I)
Applies toHUD-code manufactured homes; L&I handles alteration permits and installer rules, and local building departments permit the installation (details not confirmed).
Based on, and how far it reachesThe state's own code, current edition.Applies across the state, and local governments enforce it as written.
Adopted byDepartment of Labor and Industries; local building departments.
Modular and factory-built buildingsFactory Assembled Structures program (L&I): modular buildings, commercial coaches, RVs and park model RVsMarch 15, 2024
Applies toFactory-built (modular) buildings shipped to Washington sites, including equipment shelters people can enter, must be approved by L&I and carry an L&I insignia before leaving the factory. RVs and park model RVs sold or leased in Washington need an L&I approval label; commercial coaches and their alterations need L&I inspection and approval; temporary worker housing built in factories is inspected during construction; mobile medical units need approved alteration plans and a permit.
Based on, and how far it reachesThe state's own code, 2021.Applies across the state, and local governments enforce it as written.
Local changesThe program follows the state code cycle: the current cycle took effect March 15, 2024 and the 2024 cycle is anticipated May 3, 2027. Conversion vendor units and commercial coaches are governed by chapter 296-150V WAC.
NextThe 2024 edition code cycle, expected May 3, 2027. Anticipated effective date stated by L&I.
Adopted byDepartment of Labor and Industries, Factory Assembled Structures (FAS) program.In force since March 15, 2024.
Flood rules beyond the federal minimumFloodplain management, RCW 86.16.041 (floodway rules beyond the NFIP)
Applies toLocal floodplain ordinances, filed with the Department of Ecology, must prohibit construction or reconstruction of residential structures in designated floodways, except repairs or improvements that do not add ground floor area or cost no more than 50 percent of market value; replacement farmhouses on agricultural land of long-term significance and substantial improvements to them must have the lowest floor at least one foot above base flood elevation; Ecology may recommend waivers for substantially damaged homes based on depth, velocity and erosion analysis.
Based on, and how far it reachesThe state's own code, current edition.A minimum across the state that local governments may add to.
Adopted byDepartment of Ecology; cities and counties as NFIP communities.
Structural loadsASCE 7-16 through IBC Chapter 16 (2021 IBC)March 15, 2024
Applies toStructural design loads for buildings under the IBC; the 2021 IBC references ASCE 7-16.
Based on, and how far it reachesASCE 7, 2016 edition.A minimum across the state that local governments may add to.
Local changesState amendments to Chapter 16 in chapter 51-50 WAC (some sections reserved).
NextASCE 7-22 (with the 2024 IBC), expected May 3, 2027. Arrives with the 2024 code cycle.
Adopted byState Building Code Council; local building departments.In force since March 15, 2024.
Boilers and pressure vesselsBoilers and unfired pressure vessels (chapter 70.79 RCW; chapter 296-104 WAC, Board of Boiler Rules)
Applies toConstruction standards, installation clearances, inspection frequency and certificates of inspection for boilers and unfired pressure vessels; the City of Seattle has its own boiler and pressure vessel code.
Based on, and how far it reachesThe state's own code, current edition.Applies across the state, and local governments enforce it as written.
Adopted byBoard of Boiler Rules and Department of Labor and Industries.
Not adopted here, or not found yet
Life safetyNFPA 101, Life Safety Code (not part of the State Building Code)No code of this kind is adopted
Applies toRCW 19.27.031 does not list NFPA 101; life safety rules come from the IBC and IFC. Health care facilities in federal programs follow the CMS-required edition (see the federal page).
Based on, and how far it reachesNFPA 101.
Adopted byNot adopted.
Who designs, seals and builds
- Architect
- Washington's architect law does not restrict design of a residential building with up to four dwelling units, a farm building, or an auxiliary structure such as a garage, barn or shed; design and contract administration of any building with a total size of 4,000 square feet or less; and alterations or repairs of up to 4,000 square feet in a larger building that do not affect its life safety or structural systems. Engineers working within their practice, registered contractors and interior space planning that does not affect public health or safety are also exempt.RCW 18.08.410Checked at the source
- Engineer
- Professional and structural engineers are licensed under chapter 18.43 RCW. The law defines significant structures: hazardous facilities; essential facilities (hospitals with surgery or emergency care, fire and police stations, emergency centers, aviation control towers and similar) over 5,000 square feet and 20 feet in mean roof height; structures over 100 feet tall; occupied buildings of five or more stories; bridges over 200 feet and piers over 10,000 square feet; and buildings where more than 300 people gather in one area. These are the structures reserved for licensed structural engineers.RCW 18.43.020(10); chapter 18.43 RCWNot yet checked at the source
- Contractor
- Every contractor must register with the Department of Labor and Industries; working, bidding or advertising without registration is a gross misdemeanor. Washington registers general contractors rather than licensing them by examination.RCW 18.27.020Checked at the source
Design loads and hazards
- Wind
- ASCE 7-16 through the 2021 IBC; no hurricane-prone region. Exposure and topographic effects matter on the coast and in the Columbia Gorge (values not confirmed).
- Snow
- Ground snow loads vary widely from near zero on the coast to very high in the Cascades; many mountain areas are case-study areas in ASCE 7, so local jurisdictions set design snow loads (values not confirmed).
- Seismic
- Western Washington faces the Cascadia subduction zone and crustal faults (Seismic Design Category D in most of the Puget Sound region); eastern Washington is lower (not confirmed).
- Frost depth
- Set by each local jurisdiction (not confirmed).
- Flood
- RCW 86.16.041 bars new residential construction in designated floodways beyond the NFIP minimum, with limited exceptions.
- Other hazards
- The IRC adoption includes Appendix AF (radon control methods). Wildfire hazard mapping by the state is pending (RCW 19.27.560); tsunami hazard areas on the coast; liquefaction and landslide-prone slopes around Puget Sound.
Permits
- Who issues them
- City and county building departments issue building permits. L&I issues electrical permits except in cities with their own electrical inspection programs, and handles elevators, boilers and factory-assembled structures; in King County, Public Health issues plumbing and gas piping permits in Seattle.
- Review time limits
- RCW 36.70B.080 sets target times for local project permit decisions (65 days without public notice, 100 days with notice, 170 days with notice and a hearing, counted from a complete application, for applications submitted after January 1, 2025 in larger counties and cities, with partial fee refunds when missed), but these do not cover building permits: RCW 36.70B.020 excludes permits issued for compliance with building codes.
- Private review
- No statewide private plan review or inspection program was found; jurisdictions may contract out plan review.
Cities and counties with their own codes
- City of Seattle
2021 Seattle Building, Residential, Existing Building, Energy, Mechanical, Fuel Gas, Plumbing and Fire Codes effective November 15, 2024, the 2023 Seattle Electrical Code and its own elevator and boiler programs; 2024 Seattle codes expected no sooner than May 2027.
- King County (unincorporated)
Enforces the State Building Code with county amendments; Public Health, Seattle and King County handles plumbing and gas piping permits (not confirmed).
- City of Spokane
Enforces the State Building Code with local amendments (not confirmed).
- City of Tacoma
Enforces the State Building Code with local amendments (not confirmed).
- City of Bellevue
Enforces the State Building Code with local amendments (not confirmed).
Where to read the codes, and who to ask
- Title 51 WAC, State Building Code chapters
- Chapter 19.27 RCW, State Building Code Act
- SBCC, 2021 codes and Washington amendments (State Building Code page)
- SBCC, 2024 Code Adoption Cycle
- SBCC, Remaining 2024 Code Adoption Cycle Schedule (revised July 1, 2026)
- SBCC emergency wildfire rebuilding rule, WSEC-R Section R101.2 (WSR 26-23-002)
- Chapter 296-46B WAC, Electrical safety standards
- Chapter 296-96 WAC, Elevators and other conveyances
- DOE energy code status, Washington
- State Building Code Council (Department of Enterprise Services)Adopts and amends the State Building Code and the Washington State Energy Code
- Department of Labor and Industries (L&I)Electrical code and permits, elevators, boilers, factory-assembled structures and manufactured homes, contractor registration, electrician and plumber certification
- Department of CommerceState energy office; energy code support
- Washington State Patrol, Fire Protection Bureau (State Fire Marshal)State fire marshal functions
- Department of LicensingLicenses architects and engineers
- Department of EcologyFloodplain management and review of local flood ordinances
- Department of Natural ResourcesWildfire hazard mapping
Not found yet
- Final adoption of the 2024 codes (scheduled August 28, 2026 for the building codes and September 25, 2026 for the energy codes) was not confirmed; the Council's cycle page still showed the adopted-rule dates as to be determined.
- Whether Appendix AWU (dwelling unit fire sprinkler systems), included in the state IRC adoption, requires sprinklers anywhere or only applies where chosen was not confirmed.
- The rule that significant structures must be designed by a licensed structural engineer (RCW 18.43) is not reconfirmed in the current statute; only the definition is.
- Electrician and plumber certification (chapters 19.28 and 18.106 RCW) and the L&I boiler and manufactured home program details are not confirmed.
- The IFGC edition follows from the 2021 IMC chapter that adopts it; Department of Health public pool rules, the Clean Buildings performance standard and the State Fire Marshal's role are not confirmed.
- Wind, snow, seismic and frost values are not confirmed; no state snow load map was confirmed.
- Local adoptions by King County, Spokane, Tacoma and Bellevue are not confirmed.