See what you could build on a lot before you buy it.
We show the plans that fit, what they cost and the flood zone.
- Drawing set
- 19 sheets
- Code review
- 28 checks
- Materials order
- 145 lines
- G-001
- G-002
- C-101
- A-101
- A-201
- A-301
- A-302
- A-401
- A-501
- A-601
- A-602
- A-701
- S-001
- S-101
- S-201
- E-101
- E-201
- P-101
- M-101
Today, you piece together the answer on a lot from sources that do not talk to each other.
You look up the lot, its zoning and its flood zone
one county website at a time
You price the house
by the square foot, as a guess
Code changes keep adding to what a house costs
8.1% of the price1
The deals you saved go stale
until you price them again by hand
With XYZ, the houses that fit are priced on one page beside the flood zone, and a saved deal stays current.
You enter the address and the lot
the flood zone comes from FEMA's map
Every plan that fits is ranked and priced
with a go or no‑go on your numbers
You save the deal
priced and checked again as things change
From the brief to the plan
Drag across the sketch a designer sent in the brief for The Mangrove, one of our sample briefs, to see the floor plan XYZ drew from it.
Open this brief in the studio
Three jobs change most for investors, and here is each one with XYZ.
01
The address
Today
An address comes in with an asking price, and nothing says what could go on the lot.
With XYZ
One lookup brings back every plan that fits, ranked, each with its cost per door beside the flood zone, so lots that do not pencil drop out early.
A 75 by 120 ft lot
44 plans fit
- One story, 3 bed, 2 bath, 1,900 sq ft$368,053 a door
- One story, 4 bed, 3 bath, 2,300 sq ft$426,766 a door
- Two story, 3 bed, 2 bath, 2,600 sq ft$488,025 a door
- Two story, 4 bed, 3 bath, 3,600 sq ft$665,255 a door
Each kind of plan at its least and its most per door, at the fit page's starting build cost of $160 a sq ft, before land.
02
The storm question
Today
After a storm, repair or rebuild turns on the flood rule, and the new work's cost is a guess.
With XYZ
Enter the structure's value on a saved deal, and the flood rebuild check runs the substantial improvement test against the hard cost of the new house or your own repair figure.
A-101 Site plan
Flood zone X
03
The deals you are watching
Today
Months later, nothing tells you which numbers in a saved deal still hold.
With XYZ
Every saved deal is priced again and checked against the code a permit filed today would follow, and the page lists what moved.
Code review
28 checks
- R304.1Habitable room area
- R304.2Habitable room dimension
- R305.1Ceiling height
- R310.2Emergency escape openings
- R311.2Egress door
- R311.6Hallway width
- R807.1Attic access
Here is what comes with every address you check, and all of it stays yours.
- 01Every plan that fits the lot, drawn where it would stand
- 02A pro forma for a sale or a rental, with a go or no‑go
- 03A buy box that checks each deal's county, land price, lot size, return and flood zone
- 04A flood rebuild check for any saved deal
- 05Saved deals, priced and checked again when your prices or the code change
- 06A one-page lot report and a go or no‑go report
What it costs
$99 a month per company
- Lot fits, pro formas and dealsIncluded
- Buy box and re-pricingIncluded
- Land map: parcel search, workbooks and research memosIncluded
Checking an address you end up dropping costs no more than checking the one you buy.
Not included: sealed house sets at $4,500 each.
Questions investors ask
Where does the parcel map work?
The parcel map covers Hillsborough, Pinellas and Pasco counties in Florida today. Lot fits and pro formas take any lot you enter by its size.
What does it price?
The new houses XYZ draws, so the flood rebuild check uses the new house's hard cost unless you enter your own figure for the repair. Rehab budgets stay with you and your contractor.
Where do the costs come from?
Materials come from each plan's own order, at your price book if you have loaded one and at our Tampa Bay planning prices if not, and the rest of the hard cost from the build cost per square foot you enter. Every other default says where it comes from, so you can replace it with your own number.
Where are my deals kept?
In your browser, on your own device, together with your buy box. Links and reports never carry the address.
What can XYZ draw today?
XYZ draws one-story houses of 1,900 to 2,600 sq ft, two-story houses of 2,600 to 3,600 sq ft and rows of 3 to 6 townhomes, with hip roofs and 3 or 4 bedrooms. We draw to the Florida Building Code today, for lots in Hillsborough, Pinellas, Pasco, Polk, Manatee and Sarasota counties, at planning prices for that area. We lay out the rooms ourselves; room sizes and places in a sketch are noted for review. If your brief asks for something outside that, we tell you before we draw, so nothing about your house changes without you knowing.
Check the address you are weighing now, and see what it could hold and what that would cost.
Doing something else in real estate? See how XYZ helps the other roles
Sources, 1
- 1NAHB, Government Regulation in the Price of a New Home: 2026 (Eric Lynch), June 8, 2026. What changes to building codes over the past 10 years add to the final price of a new home (12.7% of the builder's construction cost), the largest single regulatory cost in the survey; 97.4% of builders reported it.