Skip to content

Find the open permits on an address before you set a closing date.

We look them up in the city's own permit records, and it costs you nothing.

StudioThe Mangrove, Lot 7
DWREFDWHAHUATTIC ACCESSGARAGE21'-9 3/4" x 21'-0"BATH 28'-5 3/4" x 7'-5 3/4"LAUNDRY7'-7 1/2" x 7'-5 3/4"PANTRYHALL21'-9 3/4" x 3'-3 1/2"CLBEDROOM 310'-5 3/4" x 11'-9 3/4"BEDROOM 210'-11 1/2" x 11'-9 3/4"CLDINING12'-0" x 15'-4"ENTRY PORCH7'-4" x 5'-8"FOYER7'-4" x 9'-8"KITCHEN20'-3 1/2" x 13'-9 3/4"GREAT ROOM20'-3 1/2" x 17'-9 3/4"BEDROOM 415'-8" x 9'-9 3/4"CLBATH 315'-9 3/4" x 5'-7 1/2"OWNER'S WIC5'-7 1/2" x 10'-7 1/2"OWNER'S BATH9'-9 3/4" x 10'-7 1/2"OWNER'S SUITE15'-9 3/4" x 17'-9 3/4"COVERED LANAI18'-8" x 13'-4"
Drawing set
19 sheets
Code review
28 checks
Materials order
145 lines
  1. G-001
  2. G-002
  3. C-101
  4. A-101
  5. A-201
  6. A-301
  7. A-302
  8. A-401
  9. A-501
  10. A-601
  11. A-602
  12. A-701
  13. S-001
  14. S-101
  15. S-201
  16. E-101
  17. E-201
  18. P-101
  19. M-101

Today, an open permit is a problem the sale inherits from someone else's work.

  1. You order a municipal lien search

    and wait for it to come back

  2. An open permit turns up

    close to the closing date

  3. You chase the city to close it

    against the clock

With XYZ, one lookup by address shows the open permits in the city's own records, with the source named.

  1. You enter the address

    street and city

  2. You read the open permits

    each with its number, status and source

Three jobs change most for title and closing agents, and here is each one with XYZ.

01

The open permits

Today

When a new file opens, nobody on it knows yet whether the property has an open permit.

With XYZ

Enter the address, and its open permits come back from the city's records, with no lien search to order for them.

A-101 Site plan

Flood zone X

STREET (RIGHT OF WAY)5' SIDEWALKBUILDING SETBACK LINEPROPOSED 1-STORY RESIDENCEFFE 101.69 (local datum, see C-101)COV. LANAIA/C25'-0"32'-4"7'-6"7'-6"75'-0"120'-0"N1SITE PLAN1/8" = 1'-0"Scale 1/8" = 1'-0"SITE DATAITEMLotLot areaBuilding footprintLot coverageImpervious (est.)Setbacks req. F/S/RProvided F/S/RFront facesFlood zoneCountyVALUE75' x 120'9,000 sq ft3,181 sq ft35.3%3,740 sq ft25' / 7.5' / 20'25'-0" / 7'-6" / 32'-4"South (180°)XHillsboroughSITE NOTES1.Lot lines, setbacks and zoning district tobe confirmed by a Florida-licensed surveyorand the local zoning code.2.Grade away from the house at least 6 inwithin the first 10 ft (FBC-R R401.3).Drainage arrows show flow to the street andswales.3.Finished floor 101.69 on the assumed localdatum (road crown 100.00), about 20 in abovethe crown, set by drainage on C-101; garagefloor 2 in below house floor. Finalelevations NAVD88 per the survey.4.FIRM panel number and effective date,easements and the legal description per thesealed survey.5.Building height 22'-8" from finish grade tothe ridge; check the zoning district limit(35 ft is typical for single-family).6.Foundation: monolithic slab on grade withthickened edge (S-101). Driveway and walk: 4in concrete on a compacted base.7.Right-of-way use permit for the drivewayapron and any work in the right-of-way.Vacant lot assumed: no demolition; existingconditions and trees per the survey.8.Driveway and walks are shown for permitlayout. Final grading and drainage by civilengineer where required.9.Flood zone X. No flood elevation requirementunder FBC-R R322.10.A/C condenser on a 3 in pad, anchored forwind per the engineer of record.

02

The current code

Today

When a buyer asks what a renovation would have to meet, the answer means a call to the building department.

With XYZ

Our code library shows the codes in force in the state today and when each took effect, with where to read them.

Codes across the country

56 places

  • Housesstatewide in 40
  • Buildingstatewide in 42
  • Energy, housesstatewide in 46
  • Firestatewide in 42
  • Plumbingstatewide in 48
  • Electricalstatewide in 46
  • Accessibilitystatewide in 43
Open the code library for any place

03

The closing date

Today

A permit that cannot be closed in time puts the closing date at risk, along with everything scheduled around it.

With XYZ

Look the address up the day the contract comes in, so there is time to close the permit before the closing.

A-301 Front elevation

4 bedrooms, 2,373 sq ft

Here is what a lookup gives you, free.

  1. 01Each open permit, with number, type, status and issue date
  2. 02What each permit was for, as the city describes it
  3. 03The source of every record, and what that source leaves out

What it costs

Free

  • Open permits on an addressFree
Opening a builder's shared houseFree

It works beside your lien search rather than in place of it, for the open permits alone.

Questions title and closing agents ask

Which places does it cover?

The City of Tampa today, from the city's own open permit records, and the lookup tells you when an address is outside the city. Closed and finaled permits are not in the city's data, so for the full history, turn to the city's permit search.

What does the lookup show?

Each open permit on the address in the city's public records, with its number, type, status, issue date and description, so you can ask for it to be closed in time. Liens and code cases come from a municipal lien search.

Look up the address on your next closing, and any open permit turns up before the closing date.

Doing something else in real estate? See how XYZ helps the other roles